I am getting to a point where i will need to add the downpipes and hoppers for the rainwater. In the photo below, the 2 RWP in red are existing, the other are new.
Why would i include an inspection chamber?
And where would i put it in regards to my picture i included in my first post. Sorry, this is my first home build and the drainage scares me!
Are they down pipes from roof guttering? You need to connect the existing DP into the new IC which in turn goes into your main run. I'm assuming it goes to a manhole SWMH ?
The cover on these sre dubject to 1.5 tonne loading if done correctly on a plinth. You can always upgrade cover and frame to a 5 or 12.5 tonne for heavier loading. be good to know which way the existing runs.