Lovely to see all the photies - my guess is, your son will rebel, as we all do, and become a world famous aesthete, a man of letters and renowned poet.
I always think of ex PM John Majors - who ran away from a circus family to become an accountant.
ps - give us a shout when you're next darn sth Giles.
"Meet the new boss - same as the old boss - We all get fooled again"
on the footing one with the septic tank, bco turned up today wants us to go 2.3metres down in solid clay already got it all dug out to 1m all the way rd, going to be an arse to get back in and take another 100 odd tons out. but then again i get paid for the extra
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
yeah, backs onto a tree screen for a industrial estate, clay heave and shrink from the tress drawing out water.
its that or pile it, or raft the whole 8x8m, but then theres structural engineer costs and steel and lots of concrete, see what the builder wants us to do he's paying.
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
yeah i'm thinking that as well, our 8 ton wont fit past the house to get to the back, can just about do it with the 3 ton but will be a struggle, have to fill the front side in to get the dumper across right pain.
he has said if we hit sand after 300mm then thats ok, but i'm not confident of finding it all the way around, there some on the front corner at about 1m down but doesn;t look likely loking at the strata.
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
very nice work giles
is there a reason why there is a 75mm step from the patio down to the path??
nice work on the gate piers too those brickies are tidy