Work???

General banter, tradesmen, recommendations and warnings, surplus materials, humour and owt else!
msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 34624Post msh paving

wood last's 4 years and rots off concrete for ever,i dont usually give em a choice,theres very little price difference, but i suspose customer is always right :D
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 34628Post dig dug dan

wood last's 4 years and rots off concrete for ever


i beg to differ on that one. 3" posts ,maybe, but 4" no. The first fence i ever did in 1993, using 4x4 wooden posts is still upright, and the panels are still sound, because i used a gravel board
Concrete is ok, but i am fed up with humping all that weight around.
I try to persuade them to the slotted plastic posts. they are stronger and lighter.!
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

DNgroundworks
Posts: 1951
Joined: Sat Dec 06, 2008 10:28 pm
Location: Preston, Lancashire

Post: # 34629Post DNgroundworks

Things have "picked" up a bit here everyone seems to be relatively busy considering whats happening in the economy, ive had quite a few calls and as a result am busy, but doesnt take much only me and a laborour!

Also i dont think things are quite as bad up here in the north as down in the south.

And likewise i have been undercut on quite a few jobs, how some people can get so low on there prices is beyond me, they must be workin for peanuts or summat:p

Injured
Posts: 348
Joined: Sun Feb 24, 2008 8:34 pm
Location: Widnes
Contact:

Post: # 34634Post Injured

or skimping on quality and materials???
http://www.bigdiggroundworks.co.uk

Patios and Drives Cheshire

DNgroundworks
Posts: 1951
Joined: Sat Dec 06, 2008 10:28 pm
Location: Preston, Lancashire

Post: # 34637Post DNgroundworks

well yes and that, i didnt want to put it that way but your right.

If getting a job means skimping on materials and quality, id rather not do it, as id have no satisfaction with the end product.

Suggers
Posts: 934
Joined: Tue Nov 01, 2005 10:57 pm
Location: Buckinghamshire
Contact:

Post: # 34638Post Suggers

dig dug dan wrote:
wood last's 4 years and rots off concrete for ever


Nasty concrete posts remind me of growing up in the 50's. They disintegrate quickly - rotting from the inside by that cheap steel. There's an old chestnut, about timber growing from the earth anyway? - or something like that?
Just priced up 40m of fencing -
The difference between using panels (2m centres) - as opposed to notched posts (3m centres) arris & f/edge & gravel was only £200.
Not enough price difference to the total cost, to warrant suburban look, versus quality. Posts are 125x100.
As for plastic posts, that's almost as bad as upvc windows & doors. Warp, discolour in 2/3 yrs.
Sad thing is, I still use concrete to bed the posts in - you can shoot me down...! :cool:
"Meet the new boss - same as the old boss - We all get fooled again"

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 34639Post lutonlagerlout

well i have seen the plastic and they look good after a few years so you are wrong there suggers,and i hav eseen wood fences last a long time,so dan i right in that sense
but personally i am a concrete post and gravel board man all the way,never had a comeback on it in 25 years so it does for me
:) LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 34641Post seanandruby

DNgroundworks wrote:And likewise i have been undercut on quite a few jobs, how some people can get so low on there prices is beyond me, they must be workin for peanuts or summat:p
i suppose it keeps them busy rather than sitting at home waiting for the phone to ring. also keeps the good name out there.
peanuts are far more nutritious than jam :;):
sean

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 34646Post dig dug dan

Posts are 125x100.


they must be V notched posts. Posts designed for those who do not know how to put up arris rails and morticed posts!

I still use concrete to bed the posts in - you can shoot me down.


not at all. I concrete all my posts in. How else can you do it. (mention metposts and you will be shot down!)
Just put to 6x6 gate posts in, and slurry filled them with concrete. when you are hanging a field gate from it, its got to be strong!
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 34650Post lutonlagerlout

had to hand dig two column bases in a guys living room today ,engineer assured me that the house would be trench fill concrete so we just had to dig down 450 to top of existing found,needless to say the found was 975mm down :angry: not much fun digging a hole 450 by 450 that deep by hand.
its all character building i suppose :;):
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 34651Post msh paving

been thrustboring electric duct in this morning,sent 45 mm mole through tried to tow duct in behind kept jamming , sent 55mm through towed duct through ground was getting wet and messy as frost came out,finially at 3.30,45mins drive home then got roped into another mole job for my mate just in the door at 5,45 on a sat night,gota go back and oick compressor up in morning,who what to work for themselves..... :D
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 34652Post Dave_L

"You only get out what you put in"

:)
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

flowjoe
Posts: 1136
Joined: Sun May 08, 2005 9:25 am
Location: North West

Post: # 34662Post flowjoe

MSH - what size pipework can you install with the thrust boring kit, is it your own plant ?



Edited By flowjoe on 1234695067
http://draindomain.com

Many paths can lead to riches, few in sunlight, some in ditches

msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 34667Post msh paving

hi flowjoe, i have a 45,55,95,110 mm mole,s all grundomats,

the 110mm will fit 100mm pipe but you need to use the overpriced short sections tt-uk sell,

i was fitting 38mm elect duct sat. but the ground was very stick fen soil so the duct would not slide easy

im thinking about selling the 95mm mole,if the right price came along....... ???
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk

flowjoe
Posts: 1136
Joined: Sun May 08, 2005 9:25 am
Location: North West

Post: # 34678Post flowjoe

We have the aussie mole kit up to 35mm for water feeds only, is your kit the same pneumatic moling gear ? does it follow a laser or do you point it in the right direction and hope.

I am not in the market for new kit but might be able to throw some work your way, i will P.M you later
http://draindomain.com

Many paths can lead to riches, few in sunlight, some in ditches

Post Reply