Concrete - Curing time

Other groundworks tasks, such as roads and footpaths, terracing, fencing, foundations, walls and brickwork, tools and plant.
Post Reply
Sussex Leon
Posts: 1
Joined: Thu Aug 27, 2020 11:45 am
Location: HAYWARDS HEATH

Post: # 119374Post Sussex Leon

Hi Guys, new to the forum. I'm constructing a solid base for a 7m2 patio. I've laid a course of concrete blocks round the edge on a small footing. I plan to fill with 100mm of type 1 and finish with 100mm concrete. How long do you have to leave the concrete before tiling, heard 6 weeks. I'm laying 20mm porcelain on a thin bed adhesive. Cheers

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 119431Post Tony McC

I'm not sure how I missed this post for so long!

Usual guidance is 7 days minimum, 28 days preferred. I know some tilers like to have a bone-dry substrate but, for those of us working outdoors, we have to recognise that such a requirement is not always achievable, so we do the best we can - dry surface, no standing water, good weather for the first 48 hrs, so no rain, frost, etc.