Gotta build a wall

Other groundworks tasks, such as roads and footpaths, terracing, fencing, foundations, walls and brickwork, tools and plant.
Post Reply
Forestboy1978
Posts: 1000
Joined: Sun Oct 23, 2011 9:57 am
Location: southampton, hampshire

Post: # 113973Post Forestboy1978

Not a big wall..

Basically have to shore up some ground for about 2 ft on one side of a patio. The higher ground level is going to be remain so basically the left side of a patio it going to have 2.5 meters of 2 ft natural stone brick walling going into a hill and this top course is going to continue all around the patio as the edging. Obviously I was going to joint with a compound as opposed to 4:1

To avoid angling the walling inwards I was going to shore up with concrete and then compact in layers to back fill.

Apart from concrete blocks this will be my first wall....

What could could possibly go wrong???

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 113974Post seanandruby

Easier to do 9 inch block/brick work than mess about with shuttering and concrete.
sean

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 113975Post lutonlagerlout

everything :)
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

Forestboy1978
Posts: 1000
Joined: Sun Oct 23, 2011 9:57 am
Location: southampton, hampshire

Post: # 113976Post Forestboy1978

lol

.... it's in the bag ;-)

Forestboy1978
Posts: 1000
Joined: Sun Oct 23, 2011 9:57 am
Location: southampton, hampshire

Post: # 113977Post Forestboy1978

OK so string line from highest part of the land to get a straight level line and determine where top course is going to end heigh wise.

450/450mm concrete level foundation to allow natural stone bricks to sit inside outside edge by 100mm and leave plenty of room for block or concrete behind this course.

At the point where land starts to rise shutter in concrete and incrementally reduced levels in steps to accomodate rising brick courses. Get to terminal height and continue edging all around on top of 6 inches of c30 concrete.

Bang in 100-150mm limestone lay slabs, jobs a gooden....

Oh, and for extra precautions use type 1 to back fill behind wall instead of shifting soil about to avoid clay expansion and reduce loads.

Come on, tell me the error of my ways lol

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 113978Post dig dug dan

You should backfill with gravel, and have weepholes in the wall
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

Forestboy1978
Posts: 1000
Joined: Sun Oct 23, 2011 9:57 am
Location: southampton, hampshire

Post: # 113979Post Forestboy1978

You are correct Sir.

Ta

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 113983Post lutonlagerlout

and terram to stop the gravel getting silted up
LLL :)
"what,you want paying today??"

YOUR TEXT GOES HERE

Forestboy1978
Posts: 1000
Joined: Sun Oct 23, 2011 9:57 am
Location: southampton, hampshire

Post: # 113994Post Forestboy1978

Ta

Any way of hiding those ugly weep holes. Don't want to ruin the look of sandstone walling.

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 113996Post seanandruby

Just leave a perp out every 4 bricks.
sean

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 113999Post lutonlagerlout

we have used clay land drains as an alternative at times
just for aesthetics
LLL :)
"what,you want paying today??"

YOUR TEXT GOES HERE

Forestboy1978
Posts: 1000
Joined: Sun Oct 23, 2011 9:57 am
Location: southampton, hampshire

Post: # 114008Post Forestboy1978

Thanks