104-1096815889

Post: # 6075Post 104-1096815889

I ve never done any bricklaying, only a few bricks, but want to practise, any ideas whet to build, i thought of a planter, if so do i need to leave drainage holes ? and lay on a foundation ? maybe 6 bricks high.

84-1094545549

Post: # 6076Post 84-1094545549

Yes you need drainage holes - allow for an 'empty' perpend joint every 4 bricks. And you'll definitely need a foundation if this is a permanent structure. Allow for 100mm spread either side of the brickwork and 100mm thick for bwk up to 10 courses (750mm) high.

104-1096815889

Post: # 6084Post 104-1096815889

Perpend is that the morter bit that goes up ? so i leave a gap every 4 brick going all the way to the top ? it wont be permanent see how it looks first before i get to that stage.

cheers

84-1094545549

Post: # 6088Post 84-1094545549

A perpend is the vertical joint between two adjacent bricks. There's a glossary of some of the more common bricklaying terms on the Brickwork Basics page.