Posted: Thu Jan 30, 2003 10:43 am
After my 'firm' letter to the Highways Manager of the local council, I had a site meeting yesterday with the Development Control Engineer. He's suggested chaging the footpath again, so that the back (ie where it meets my land) is higher than the front, rather than the current 'domed' arrangement; and to do it in such a way as to ensure next-door's runoff doesn't end up in my garden either.
This means that they'll create a ramp on my driveway. They'll do this on their own, but have also said that they'll coordinate with me redoing my drive if I want them to, which will save them some materials and means I won't end up with an ugly tarmac strip.
So far so good.
So I'll allow any surface water to drain through the gravel and sub-base, as before, but this time it will only be water that falls on my land, not all my neighbours too.
Many thanks for all your help.
Neil
(Edited by nezza at 2:02 pm on Jan. 30, 2003)
This means that they'll create a ramp on my driveway. They'll do this on their own, but have also said that they'll coordinate with me redoing my drive if I want them to, which will save them some materials and means I won't end up with an ugly tarmac strip.
So far so good.
So I'll allow any surface water to drain through the gravel and sub-base, as before, but this time it will only be water that falls on my land, not all my neighbours too.
Many thanks for all your help.
Neil
(Edited by nezza at 2:02 pm on Jan. 30, 2003)