Page 1 of 1

Posted: Mon Jul 13, 2015 12:46 pm
by split59
Hi first of all thank you what a great place this been reading through for the last couple of weeks and the info I have got from here is outstanding.


Anyway im now confused as to what to do re my sub base

I was just going to use concrete at 75 to 100mm then a full cement bed of 40mm for the Indian sandstone. Its only a smallish patio 8 mtrs total wide then l shaping out 2 mtrs and 3 mtrs. don't mind using type 1 just thought concrete was easer and stronger. Iv read about having to add drainage if using concrete is this correct?
Cheers Malc

Posted: Mon Jul 13, 2015 2:07 pm
by lemoncurd1702
Type 1, quicker, cleaner and cheaper.

Could use a lean concrete. Don't know why it would need draining though, other than laying it to a fall for water run off. When your patio is laid it will be an impermeable surface anyway, that's assuming you're doing the proper thing and bedding it on mortar.

Posted: Mon Jul 13, 2015 3:51 pm
by split59
yep full mortar bed. Just thinking concrete would be stronger. On the plus side have 2+ ish ton left over from wall foundations so another 3 ton should see me done