Posted: Sun Jul 10, 2011 12:30 pm
I have laid a patio for a client that includes 3 steps that run down to a lower level of the garden. I have started pointing the slabs but 2 slabs overhang the steps by about 3 inches. How do I point the overhang given that it is not supported by a sub base?