Posted: Sun Jul 10, 2011 12:30 pm
by Hortic52
I have laid a patio for a client that includes 3 steps that run down to a lower level of the garden. I have started pointing the slabs but 2 slabs overhang the steps by about 3 inches. How do I point the overhang given that it is not supported by a sub base?

Posted: Sun Jul 10, 2011 1:14 pm
by lutonlagerlout
3 inches is a bit too much lip on a step,more chance of the slab lifting with that amount of over hang
to point the gaps use gaffer tape stuck underneath to support the mortar till it goes off
cheers LLL