Page 1 of 1

Posted: Thu Aug 30, 2007 9:08 pm
by Ramsey
Hi,

I have constructed a multi-level patio with concrete steps joining them. On the patios I have used a cement and sharp sand semi dry mix as a bedding layer. But what should I use to bed the flags onto each of the concrete steps. Should I use a cement sharp sand mix again, or should I be using a cement building sand mix for extra adhesion (as I obviously don't want the flags to work loose off the concrete steps as this would be a safety hazard). Any help or advice would be much appreciated.

Thanks :)

Posted: Thu Aug 30, 2007 9:49 pm
by DeckmanAdam
As an added strength you could paint the back of slabs and the steps with some PVA/Cement/Water mix

Posted: Fri Aug 31, 2007 4:04 am
by lutonlagerlout
i would add PVA or ronafix if you can get it to the mix, and yes would make it a lot wetter
and would ask the client not to stand on the edges for a day or 2 (which they normally seem to love doing)
cheers LLL

Posted: Fri Aug 31, 2007 8:35 pm
by DeckmanAdam
lutonlagerlout wrote:i would add PVA or ronafix if you can get it to the mix, and yes would make it a lot wetter
and would ask the client not to stand on the edges for a day or 2 (which they normally seem to love doing)
cheers LLL
tell me about it lol....funny how slabs are fine and then rocking the next day when they have been out the night before inspecting.

Posted: Fri Aug 31, 2007 8:50 pm
by Ramsey
Thanks guys. Much appreciated. :)