Posted: Mon May 22, 2006 1:08 pm
HI, just a bit of advice please:-
When I am laying my slabs, I am using a full mortar bed, and setting them slightly high so that I can then tap them down into the mix, to the right level. The mortar then squishes up the gaps at the edges, and so far I have been taking it out, while I wait to be able to do all the pointing in one go. Can I leave this mortar up the gaps, as it effectively looks like it has been pointed untill I take it out.
Thanks
When I am laying my slabs, I am using a full mortar bed, and setting them slightly high so that I can then tap them down into the mix, to the right level. The mortar then squishes up the gaps at the edges, and so far I have been taking it out, while I wait to be able to do all the pointing in one go. Can I leave this mortar up the gaps, as it effectively looks like it has been pointed untill I take it out.
Thanks