HI, just a bit of advice please:-
When I am laying my slabs, I am using a full mortar bed, and setting them slightly high so that I can then tap them down into the mix, to the right level. The mortar then squishes up the gaps at the edges, and so far I have been taking it out, while I wait to be able to do all the pointing in one go. Can I leave this mortar up the gaps, as it effectively looks like it has been pointed untill I take it out.
Thanks
Laying slabs
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact: