Page 1 of 1

Posted: Tue May 10, 2005 10:34 am
by mike h
Hi
I am about to lay some local peak gritstone flags onto a 9:1 grit sand:cement mix with 10-12 mm mortared joints and wondered whether I should dampen them before laying and/or before pointing. I've read a little on the site about 'thirsty' flags and it made me wonder.
Thanks.

Posted: Tue May 10, 2005 8:00 pm
by Tony McC
If the bedding is just moist or semi-dry, then there's nowt to be gained by wetting the flags.

Posted: Tue May 10, 2005 8:31 pm
by mike h
Thanks for the prompt reply:)
Excellent site by the way.