Hi
I am about to lay some local peak gritstone flags onto a 9:1 grit sand:cement mix with 10-12 mm mortared joints and wondered whether I should dampen them before laying and/or before pointing. I've read a little on the site about 'thirsty' flags and it made me wonder.
Thanks.