Generator

For the discussion of hand tools, power tools, operated and non-operated plant, and all sorts of kit associated with the paving and drainage trades
Post Reply
DNgroundworks
Posts: 1951
Joined: Sat Dec 06, 2008 10:28 pm
Location: Preston, Lancashire

Post: # 34691Post DNgroundworks

Hi all, does anyone know what size/power of generator id need to run 9" grinder, Boil Kettle, run mixer etc???

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 34692Post Dave_L

Have you got the wattage of the tools you intend to run?
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

DNgroundworks
Posts: 1951
Joined: Sat Dec 06, 2008 10:28 pm
Location: Preston, Lancashire

Post: # 34693Post DNgroundworks

Not off hand, Just could do with a general idea..

I understand it must have to be a pretty large KVA model to run a kette, but i dont want to over do it and end up buying a f*kin great thing thats a pain to move about!

msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 34695Post msh paving

iv got a 2.6max kva suitcase geeny runs kettle, mixer,drill no probs wont run a 110v tranny, cost 400 quid from a ebay shop had it 18 months 1 man can carry it no probs,tea on tap ..... :D
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk

DNgroundworks
Posts: 1951
Joined: Sat Dec 06, 2008 10:28 pm
Location: Preston, Lancashire

Post: # 34698Post DNgroundworks

Ahh rite so itll run a kettle but not a tranny? it needs to be able to run one due to everthing being 110v!

So somthing like a 4kva one then?

msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 34701Post msh paving

if you need 110v buy one with 110+240 , no point in carting a tranny about, 3kva will do just about everything you get to a 4 kva weight and cost goes up, theres lads on ebay on buy it now :D
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk

DNgroundworks
Posts: 1951
Joined: Sat Dec 06, 2008 10:28 pm
Location: Preston, Lancashire

Post: # 34702Post DNgroundworks

Orite cheers MSH i thought about that just after i posted:D

RAPressureWashing
Posts: 985
Joined: Wed Aug 15, 2007 3:02 pm
Location: Staines Surrey
Contact:

Post: # 34703Post RAPressureWashing

This might help.
www.justgenerators.co.uk
Roger Oakley BDA(Europe)Member 2006
R&A Pressure Washing Services Ltd
info@rapressurewashing.co.uk
www.rapressurewashing.co.uk

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 34704Post dig dug dan

brought a 3kva honda powered generator from an ebay seller, brand new £140.
BUT, be very careful with using one to boil a kettle, as this is what blows them up (eventually). its the initial surge when you turn it on that the genny cannot cope with. go into your kitchen and turn the kettle on, while watching you lights. you will see them dim slightly with the surge.
most kettles are 2700w.What i have done is brought a small travel kettle that is only about 600w. it hardly makes the genny grunt.
oh by the way, it has 110v built in too.
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 34705Post msh paving

good point dan,just went into yard and my kettle is a 1.7kw,runs it a treat did not thick it was a low powered one..... :D
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 34706Post GB_Groundworks

we have a towable 12kva generator on site for the site cabin, made the mistake of having kettle, microwave and heaters on all at once, blew the 28 amp breakers oops haha kettles have a massive pull on power. we have a 3kva honda one but its petrol put will power 110 tool or a non fast boil kettle and can be lifted by 2 men easily. make sure you keep an eye on it we lost one of site when someone pulled in and just lifted it into tranny and sped off leaving us wondering why no radio haha.
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

Post Reply