Page 1 of 1

Posted: Tue Sep 08, 2009 6:51 pm
by timothy
I am laying a block paving pathway as part of larger driveway that will be mostly tarmac. The ground slopes front to back about 8 inches over 7 metres. Does it matter if I start the pathway at the bottom (near the road) or at the top (by the front steps)?

Posted: Tue Sep 08, 2009 7:13 pm
by DNgroundworks
Id start from the bottom upwards, its just easier, its more important on increased gradients to start at the bottom :)

Posted: Sat Sep 12, 2009 6:56 pm
by blue70
Start at the bottom because then the blocks lay back on themselves instead of sliding away from you.

Posted: Sat Sep 12, 2009 7:57 pm
by lutonlagerlout
3 outta 3 bottom first m8
LLL :)