Imprinted concrete - Advice
-
- Posts: 8
- Joined: Wed Feb 06, 2013 4:36 pm
- Location: Stoke
I have had a quote today to do our drive i wanted tarmac but the firm advised against due to the cost and said the concrete would be best. The reason he advised against tarmac is that i have a small recovery truck and when a car is on the truck the weight is about 3.5 tons, he claimed that the tarmac cost would be more then the concrete.
Any advice at the moment they are slabs and the total area is 125 sq mts i wont say what he quoted yet as not sure is allowed
thanks
Any advice at the moment they are slabs and the total area is 125 sq mts i wont say what he quoted yet as not sure is allowed
thanks
-
- Posts: 1270
- Joined: Mon Aug 10, 2009 8:30 am
- Location: york work anywhere where the stone takes me
- Contact:
-
- Posts: 169
- Joined: Wed Nov 28, 2012 4:26 pm
- Location: Cambridgeshire
steveing wrote:Re-inf Fibres for the concrete
I know we have just had a chat about the use of fibres and why architects use them and the doses they use in large scale factory floors, but it was this type of use i was getting at.
The spec you have been quoted IMO is crap
for a 3.5t load spec should be more like
150mm Type 1
125mm C35 concrete (6% AEA)
A192 Steel mesh and fibres (for plastic shrinkage)
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
So, what's the diff between a P3/400 mix and a simpler C35?
For a 3.5T load, I'd definitely opt for 125mm concrete, and as it's for a recovery truck, I'd usually recommend concrete in preference to blacktop, but in terms of cost, 125m² of 'mac should be a little cheaper than reinforced concrete. There won't be a lot in it, maybe a grand, but once you go over 100m², mac is *usually* cheaper.
The mac would need to be min 100mm, either 100mm a single base/bindeer course, or 70mm binder with 30mm surface/wearing course. And that assumes you are not using trolley or bottle jacks.
For a 3.5T load, I'd definitely opt for 125mm concrete, and as it's for a recovery truck, I'd usually recommend concrete in preference to blacktop, but in terms of cost, 125m² of 'mac should be a little cheaper than reinforced concrete. There won't be a lot in it, maybe a grand, but once you go over 100m², mac is *usually* cheaper.
The mac would need to be min 100mm, either 100mm a single base/bindeer course, or 70mm binder with 30mm surface/wearing course. And that assumes you are not using trolley or bottle jacks.
Site Agent - Pavingexpert
-
- Posts: 169
- Joined: Wed Nov 28, 2012 4:26 pm
- Location: Cambridgeshire
-
- Posts: 169
- Joined: Wed Nov 28, 2012 4:26 pm
- Location: Cambridgeshire
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
That's what I thought - there's not a lot in it, in terms of cement content, so I wondered whether there was something about additives, entrained-air, agg type or summat else that warranted the distinction.TheRockConcreting wrote:A P300 is a cement content of 300kg/m3
C35 has more cement 320kg/m3
I really do need to update my knowledge of concrete mixes. It all started to confuse me when they switched to the Euro-codes a few years back, and exercise I felt benefitted bureaucrats more than the trade itself. We knew where we were with, say, a C35 50mm slump, but once they started with the split references, it just made me nod off!
Site Agent - Pavingexpert
-
- Posts: 162
- Joined: Sun Jul 17, 2011 1:21 am
- Location: Essex
Jay’s sound advice of a C35 concrete incorporating AEA (air entraining admixture) will give you an external slab for a house drive that should last a lifetime (obviously assuming everything is done to the book).
This exceeds the British Standard (BS 8500) requirement for such an application. For house drives and domestic parking the BS requirement is a PAV1 which is a C30 concrete incorporating AEA with a minimum cement content of 280 kg/m3 and maximum water/cement ratio of 0.60. This has been in place for many years.
However, what has been amended in the BS in the last few weeks is the requirement for a PAV2 – concrete for heavy-duty external paving with rubber tyre vehicles (basically external slabs trafficked by HGV’s). Note, it does not cover the more extreme applications such as certain scrap yards, foundries or busy public roads – in such cases specialist advice should be sought. The specification has now been upgraded to a C40 concrete (it was C35) incorporating AEA with a minimum cement content of 340 kg/m3 and maximum water/cement ratio of 0.45.
The minimum air content for both PAV1 and PAV2 has also been increased from 3.5% to 4.5% by volume for 20mm aggregate. Most ready mix suppliers will target 6.0 to 6.5% to ensure they do not fall foul of the minimum. The slump class for PAV2 has also been increased from S2 (70mm) to S3 (120mm) to cope with the mix being more difficult to lay. As a consequence of the higher specification, the batching cement content is likely to be circa 350 – 390 kg/m3 depending on cement type and quality control criteria and therefore the mix will be fairly “sticky� and prone to “go off� quite quickly, particularly in warm, windy weather.
The reason for PAV2 being upgraded is that the last few winters have been quite severe resulting in many external slab failures, particularly yards trafficked by HGV’s such as distribution warehouses etc.
The BS also states that neither RA (recycled aggregate generally originating from construction demolition waste) nor RCA (recycled concrete aggregate) can be used in any % in PAV1 or PAV2. The aggregate must also be freeze-thaw resistant.
Ps, I agree with Tony’s comment that concrete is far more complicated now than it was. When I first started in the ready mixed concrete industry many years ago there used to be about half a dozen mixes such as 1-2-4, 1-3-6, 1-1.5-3, 3000 psi (21 N/mm2) and 4500 psi (35 N/mm2). Now we have thousands!!! The only significant benefit in change is that the vast majority of concrete is now batched by computer rather than someone pulling levers or pressing buttons.
This exceeds the British Standard (BS 8500) requirement for such an application. For house drives and domestic parking the BS requirement is a PAV1 which is a C30 concrete incorporating AEA with a minimum cement content of 280 kg/m3 and maximum water/cement ratio of 0.60. This has been in place for many years.
However, what has been amended in the BS in the last few weeks is the requirement for a PAV2 – concrete for heavy-duty external paving with rubber tyre vehicles (basically external slabs trafficked by HGV’s). Note, it does not cover the more extreme applications such as certain scrap yards, foundries or busy public roads – in such cases specialist advice should be sought. The specification has now been upgraded to a C40 concrete (it was C35) incorporating AEA with a minimum cement content of 340 kg/m3 and maximum water/cement ratio of 0.45.
The minimum air content for both PAV1 and PAV2 has also been increased from 3.5% to 4.5% by volume for 20mm aggregate. Most ready mix suppliers will target 6.0 to 6.5% to ensure they do not fall foul of the minimum. The slump class for PAV2 has also been increased from S2 (70mm) to S3 (120mm) to cope with the mix being more difficult to lay. As a consequence of the higher specification, the batching cement content is likely to be circa 350 – 390 kg/m3 depending on cement type and quality control criteria and therefore the mix will be fairly “sticky� and prone to “go off� quite quickly, particularly in warm, windy weather.
The reason for PAV2 being upgraded is that the last few winters have been quite severe resulting in many external slab failures, particularly yards trafficked by HGV’s such as distribution warehouses etc.
The BS also states that neither RA (recycled aggregate generally originating from construction demolition waste) nor RCA (recycled concrete aggregate) can be used in any % in PAV1 or PAV2. The aggregate must also be freeze-thaw resistant.
Ps, I agree with Tony’s comment that concrete is far more complicated now than it was. When I first started in the ready mixed concrete industry many years ago there used to be about half a dozen mixes such as 1-2-4, 1-3-6, 1-1.5-3, 3000 psi (21 N/mm2) and 4500 psi (35 N/mm2). Now we have thousands!!! The only significant benefit in change is that the vast majority of concrete is now batched by computer rather than someone pulling levers or pressing buttons.
Retired DIY'er
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
if you upgrade to jays mix the concrete alone will probably cost in the region of £1300 ,plus a grand for stone, then dig out etc etc
so £6900 looks a fair price for the new spec
btw sorry to hijack this thread but saw a 50 year old groundworker yesterday , been at it for 35 years and was driving past our job
he stopped for a chat and I asked why he wasnt working?
he got out and dropped his kecks
he had 1st degree burns all over his legs apart from 2 squares where his kneepads were
he was wearing trousers and he still cannot work out why this particular batch did this
but a good warning anyway
wet concrete can burn
LLL
so £6900 looks a fair price for the new spec
btw sorry to hijack this thread but saw a 50 year old groundworker yesterday , been at it for 35 years and was driving past our job
he stopped for a chat and I asked why he wasnt working?
he got out and dropped his kecks
he had 1st degree burns all over his legs apart from 2 squares where his kneepads were
he was wearing trousers and he still cannot work out why this particular batch did this
but a good warning anyway
wet concrete can burn
LLL
-
- Posts: 169
- Joined: Wed Nov 28, 2012 4:26 pm
- Location: Cambridgeshire
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
-
- Posts: 1270
- Joined: Mon Aug 10, 2009 8:30 am
- Location: york work anywhere where the stone takes me
- Contact: