with the tying gun you would blast through making them up, just lay em' down 4 or 6 to a big sheet. or using the deck chairs 6 to a sheet, try them when doing a flat pad, you might be like them i'm looking a tying gun in a auction thursday if it is the right price MSH
Edited By msh paving on 1380132732
Reinforcing a concrete drive - Concrete drive
-
- Site Admin
- Posts: 1854
- Joined: Tue Aug 19, 2008 7:03 pm
- Location: kings lynn norfolk
- Contact:
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk
http://mshpaving.co.uk
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
The deck chairs ie the triangular are good but generally only 100mm or 200mm you need more than 6 a sheet if walking on it say with a pump we use 12 to a sheet between the to layers of mesh and they need tiring on the bottom sheet to stop them spreading
Most the slabs we pour the mesh is spec d 40 or 50 mm from the bottom of the slab then a smaller mesh 50mm from the top for crack control
Most the slabs we pour the mesh is spec d 40 or 50 mm from the bottom of the slab then a smaller mesh 50mm from the top for crack control
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Posts: 18
- Joined: Mon Oct 30, 2006 10:49 am
- Location: Notts
I just want to thank everyone who posted and would say that I have postponed this project till the spring for various reasons one of which is that I now believe that a ground reinforcement grid may be the way to go instead for part of the project although some concreting will still need to be done.
I will probably be asking some questions about this in future posts