is that 1200 wide tony or do they make them wider now? do you have to do a hand rail as well for them?
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
got back at ten tonight from leaving at 6am long day been filling the test trenches the prior contactors left in a state, all day of the trech compactor,we need one of those remote control rammax jobbies
theyd left 2m deep trenches no way i was going in there without shoring so filled then lowered rammer in hung off digger and walk it up and down on a strap worked ok isn
bed for me back there for 8am full day on the 3ton and breaker 500m2 to break out
theyd left 2m deep trenches no way i was going in there without shoring so filled then lowered rammer in hung off digger and walk it up and down on a strap worked ok isn
bed for me back there for 8am full day on the 3ton and breaker 500m2 to break out
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
I did 8 hours breaking out concrete floors today varied from 40mm to 400mm in the kx71-3 and Krupp breaker I had it regassed the other day did almost 400m2 of the 540m slab. Had ear defenders and safety specs on but still got a cracking headache
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Posts: 307
- Joined: Sat Mar 26, 2011 5:34 pm
- Location: Grrrrrr
when im on the breaker all day i always double up, put in ear buds then over ear muffs.GB_Groundworks wrote:I did 8 hours breaking out concrete floors today varied from 40mm to 400mm in the kx71-3 and Krupp breaker I had it regassed the other day did almost 400m2 of the 540m slab. Had ear defenders and safety specs on but still got a cracking headache
-
- Posts: 1405
- Joined: Thu Sep 27, 2007 10:29 am
- Location: South Wales
- Contact:
-
- Posts: 1405
- Joined: Thu Sep 27, 2007 10:29 am
- Location: South Wales
- Contact:
-
- Posts: 1136
- Joined: Sun May 08, 2005 9:25 am
- Location: North West
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
Means you can dig inline with your near side tack against a wall etc without having to angle the cab and work squiffy lie in a machine with a movable king post great for trenching down the kerb line say as your track is where the bucket digs and you square on and pulling in the correct way so you aren't pulling sideways or over your track motors
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Site Admin
- Posts: 1854
- Joined: Tue Aug 19, 2008 7:03 pm
- Location: kings lynn norfolk
- Contact:
A job we did 2 days ago, cutting a storm water pipe,fitting a cast iron penstock in the line with flexseal couplings ,manhole over top,the reason for this is a agrofluid factory to stop chemicals getting in storm system if leakage happen
MSH
MSH
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk
http://mshpaving.co.uk
-
- Posts: 1405
- Joined: Thu Sep 27, 2007 10:29 am
- Location: South Wales
- Contact: