Concrete path
-
- Posts: 1071
- Joined: Sat Aug 22, 2009 8:57 pm
- Location: essex
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
3.9 cube get ready mix in you fool.......
why so deep for a pavement?
if you really want to lay it yourself then its for c20
You will need approximately.....
1280 Kg of cement
2520 Kg of sand
4680 Kg of gravel
1200 Litres of water
remeber bulk bags are 880kg ish not 1000kg
why so deep for a pavement?
if you really want to lay it yourself then its for c20
You will need approximately.....
1280 Kg of cement
2520 Kg of sand
4680 Kg of gravel
1200 Litres of water
remeber bulk bags are 880kg ish not 1000kg
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Posts: 1071
- Joined: Sat Aug 22, 2009 8:57 pm
- Location: essex
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire