Post: # 77058Post lutonlagerlout

pricing another awkward job so this is one for you digger fellas
due to proximity of conifers some of the founds need to be 2400mm deep,some 1800 some 1500 and some at 1200
I dont mind hand digging but I know that this is way too deep for that
heres the crunch
the access is only 900mm
I have a feeling that there are machines that small but will they dig in clay and flint to 2400?
other options are piles and ring beam
or maybe a raft
what says the digger men?
thanks
LLL :)
"what,you want paying today??"

YOUR TEXT GOES HERE

DNgroundworks
Posts: 1951
Joined: Sat Dec 06, 2008 10:28 pm
Location: Preston, Lancashire

Post: # 77059Post DNgroundworks

A micro will not dig to 2.4 mtrs im pretty sure of that, 1.8 is the limit with a kubota U10. The kubota U17-3 is 990mm wide with a dig depth of 2.3 mtrs. most machines will be similar, im just familiar with kubota. The U series are higher speced than the kx series btw, in terms or reach etc.

Look like it could be the ring beam jobby? Or crane a 3 tonner in

:)

msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 77060Post msh paving

tony most 1.5 ton m/c's will dig 1.8-2.2m but the 900mm is out off the question, my micro is 750 wide will dig 1.7ish maybe a tad more,most 1.5 ton are 1.3m wide,you may get a small drop hammer rig in a 900mm and then pile the job or as Giles said this week use a grundomat and pile 150mm with them ,I would suggest a raft is the way forward but im not a str. engineer MSH :)
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk

digerjones
Posts: 889
Joined: Fri Jan 18, 2008 9:32 pm
Location: cheshire

Post: # 77069Post digerjones

msh paving wrote:tony most 1.5 ton m/c's will dig 1.8-2.2m but the 900mm is out off the question, my micro is 750 wide will dig 1.7ish maybe a tad more,most 1.5 ton are 1.3m wide,you may get a small drop hammer rig in a 900mm and then pile the job or as Giles said this week use a grundomat and pile 150mm with them ,I would suggest a raft is the way forward but im not a str. engineer MSH :)
think your wrong about the width of 1.5 minis, i've got 2 and sure they are just less than 1m and one of mine is 1.6ton.

tony if the access is tight but you have plenty of room in there you could get a micro in and reduce the dig before you start digging the footing.
dylan

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 77071Post dig dug dan

tony, i spoke to some builders up the road on my estate doing a side two storey extension, on a house exactly the same as ours, next to mature oak trees.
The building officer asked them go to 2.4m. He told me it was cheaper to pile it.
One reason was the amount of cart away, the amount of concrete that had to go back in, and the time to do it all.
The piling company did it in a day :)
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 77072Post lutonlagerlout

we have had fairly reasonable piling quotes in the past,around 3k for a small extension ,we then had to do the ring beam ourselves
problem is i just aint up for digging more than 1.2 unsupported,if it goes you are gone
i saw a trench 2.7m go 4 years ago and it went like a pistol shot,any man down there would have been dead and the concrete wagon had just pulled up
thanks for the advice ,i had considered craning a 3tonner over but at £650 + vat each way its a big lump straight on the job
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

Pablo
Posts: 1990
Joined: Sun Mar 25, 2007 10:49 pm
Location: N/Ireland

Post: # 77073Post Pablo

Crane it thats what I've done in the past it'll surely be the cheapest way to do it and a local firm could do it way cheaper than that it's only a quick lift and should fit it in early before they head off to the next site. Even at day rate thats a huge price. Can you get access from other properties through a fence etc and use track mats to protect the ground
Can't see it from my house

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 77074Post dig dug dan

Crane it thats what I've done in the past it'll surely be the cheapest way to do it and a local firm could do it way cheaper than that it's only a quick lift and should fit it in early before they head off to the next site. Even at day rate thats a huge price. Can you get access from other properties through a fence etc and use track mats to protect the ground


by the time you have paid for the crane, machine, muck away, concrete in, re-inforcing + trench shoring, Piling WILL be cheaper
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 77076Post lutonlagerlout

already rang around pablo,you pay for half a day even if the lift is only 20 minutes
TBH i dont like the idea of a 3 tonne machine going over someone's house,plus you still have a deep excavation to deal with
piles or raft it is for sure
thanks
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

Pablo
Posts: 1990
Joined: Sun Mar 25, 2007 10:49 pm
Location: N/Ireland

Post: # 77078Post Pablo

Fair enough Tony how big are the conifers by the way becuase they're generally the shallowest rooting of all the trees it would be unusual to find anything more than fine fibre at .5m and below on even the 90ft+ ones so 2.4m seems beyond over kill.
Can't see it from my house

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 77083Post GB_Groundworks

maximum dig depth is ok but you never really dig at that say its 2.5m then realistically dig depth is 2.3 say as youve got a small working envelope

id mini pile it then 400x450 ground beam, our structural engineer says £30m linear metre for 150mm piles and then £300 mobilisation cost thent he ground beam

id definetly think pilling is your best option, ive done a few at 2.4 near tress and its a pain in a 3 ton, plus the amount of stuff you'll be getting rid off means the muck away costs will be more than pilling it.
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

Al Jardin
Posts: 174
Joined: Mon Jul 12, 2010 5:56 pm
Location: Diss, Norfolk/Bury St. Edmunds, Suffolk.

Post: # 77093Post Al Jardin

From what planet do these building control people come from. I've heard many stories regarding deep foundations for buildings near non threatening trees. Then for another officer to come out and say 'it doesn't need to be that deep' after you've spent x over the top. I take it they're not retired builders.

Al
Garden maintenance & soft landscaping.

Mikey_C
Posts: 952
Joined: Mon Oct 30, 2006 8:24 pm
Location: Bournemouth, Dorset

Post: # 77101Post Mikey_C

excuse my ignorance but aren't you going to suffer with the same access problems for the piling machine?

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 77104Post Dave_L

Mikey_C wrote:excuse my ignorance but aren't you going to suffer with the same access problems for the piling machine?
No, that'll come in via helicopter.

Simples! :cool:
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

Pablo
Posts: 1990
Joined: Sun Mar 25, 2007 10:49 pm
Location: N/Ireland

Post: # 77107Post Pablo

micropile machines are the same width as micro diggers but they're very long so getting through isn't the problem it's turning the corner that is.
Can't see it from my house