Recent work
-
- Posts: 1990
- Joined: Sun Mar 25, 2007 10:49 pm
- Location: N/Ireland
Yes I was given a budget and a list of wants. It was supposed to be finished months ago but I've had to wait for the new doors to be fitted because they set the level for everything and the deck couldn't be installled before them having to do this along with another job now because I've had to work around plumbers tilers and kitchen fitters who've all wanted to walk over everything I'm doing so had to start another one which I hate doing.
Can't see it from my house
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
The trouble with our work, compared to you pavers etc is that like 80% of it is buried, pipes, ducts, manholes etc etc etc so it doesn't look half as pretty as these super patios etc!!
But those enabling works were 5 hard weeks of work!
But those enabling works were 5 hard weeks of work!
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
Yeah it all fell into place early December, great job to land for frosty/icy mornings etc- a time of year when we can't do much surfacing work.
Hopefully we we will get invited to tender for the groundworks for the two houses late spring too.
Lots of manholes constructed, forgot these...
160mm duct with 1200x600 drawpits at 20m intervals for 63mm PE Gas service to be installed at a later date, 2 x 32mm water supplies, 100mm foul service to main sewer and a electric duct for driveway bollard lighting. A busy service trench!!
Hopefully we we will get invited to tender for the groundworks for the two houses late spring too.
Lots of manholes constructed, forgot these...
160mm duct with 1200x600 drawpits at 20m intervals for 63mm PE Gas service to be installed at a later date, 2 x 32mm water supplies, 100mm foul service to main sewer and a electric duct for driveway bollard lighting. A busy service trench!!
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
great work guys
some cracking designs there pablo
no excuse for flags stacked like that I took my licks off the gaffer for it :;):
the render on walls to me seems a very scottish and irish thing,mind you the inclement weather makes it a good choice
we rarely get any clients want anything as artistic as pablo's creations
top notch both of ya
LLL
some cracking designs there pablo
no excuse for flags stacked like that I took my licks off the gaffer for it :;):
the render on walls to me seems a very scottish and irish thing,mind you the inclement weather makes it a good choice
we rarely get any clients want anything as artistic as pablo's creations
top notch both of ya
LLL
-
- Posts: 1405
- Joined: Thu Sep 27, 2007 10:29 am
- Location: South Wales
- Contact:
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
the render on the walls is used a lot in contemporary garden designs and has gained more popularity in recent years seeing as lots of flower shows including Chelsea have garden displays showing this type of finish
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
the high end designers would use the snocrete or similar renders but most use normal render and either cream or white paint finish, what most do which I don't agree with is to not have a coping on top of the block wall instead using render on the top which must lead to issues at a later date
if you do see a full brick house it tends to stick out like a sore thumb as like you say all the other houses are rendered , I have only been the once many years ago and was told its because bricks are imported hence more expensive than block work and render finish, I don't know if that's changed now as it was in the 80's when I was there
if you do see a full brick house it tends to stick out like a sore thumb as like you say all the other houses are rendered , I have only been the once many years ago and was told its because bricks are imported hence more expensive than block work and render finish, I don't know if that's changed now as it was in the 80's when I was there
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 952
- Joined: Mon Oct 30, 2006 8:24 pm
- Location: Bournemouth, Dorset
seelutonlagerlout wrote:a picture would be handy mikey
the roof is indeed overspecified haggi
all that timber is tanalised 250 by 50 joists and 150 by 50 rafters
all bolted together and resin anchored onto the wall
plus every single tile has to be fixed with a screw and fixing due to the low pitch
back on climbing phil the scaff summited mount Kilimanjaro today
said it was a lot harder than he imagined
LLL
here
started in separate thread
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
spoke to phil about Kilimanjaro
it cost them 3 grand each for the package which included flights and everything,think they had to bung the porters a few quid tip
he said it was very clean up there as all parties are weighed and you get charged for any lost weight when you descend ++ so rubbish is brought down
he said although a great experience it is very very uncomfortable above 5000 m
struggle to catch your breath all of the time
cheers LLL
it cost them 3 grand each for the package which included flights and everything,think they had to bung the porters a few quid tip
he said it was very clean up there as all parties are weighed and you get charged for any lost weight when you descend ++ so rubbish is brought down
he said although a great experience it is very very uncomfortable above 5000 m
struggle to catch your breath all of the time
cheers LLL
-
- Posts: 196
- Joined: Fri Jun 17, 2011 10:49 pm
- Location: Romford Essex
-
- Posts: 2504
- Joined: Thu Jul 10, 2003 10:20 pm
- Location: hemel hempstead,herts. 01442 212315
slips and darts :p
Edited By dig dug dan on 1330717199
Edited By dig dug dan on 1330717199
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"