In this photo the concrete haunch is embedded into the sub-base. How is this done. Is a bit of the compacted sub base removed to leave a depression to drop the wet concrete into or is the diagram just representative.
It seems more likely you would whack down the sub base level and then build the haunch on top.
You can install a base for your paving then install your edges and haunch and then top up the base to exact depth using tight strings from your edge course and dip through then you would achieve this profile.
Sorry about the picture quality but that's subbase topped up to 95mm below finnished level then blinded with sharpe sand After edges were installed for 60 mm thick regatta blocks.
......The question seems to be hag, about concrete under the edgings. You can't build up off your subbase, they need to be bedded in concrete to, as LLL suggests. I know that's what you meant :;):
Say you lay 100mm right through and wack it then concrete your edges then another 50mm subbase compacted inside your area to be paved using your edges to get an accurate depth