Hi, our builder poured the footings for a pair of three bedroomed two storey brick and block built houses on thursday. the trenches were 1300 and he poured 900mm of concrete but did not stake the corners out. the back left hand corner is 200mm lower than the front right hand corner and the bit in betwee tapers down from high to low. He says it would be too time consuming to make it up with brick and block and to get around this he proposes repouring over what has already been poured, next weekend. this would be around another 300 or 400mm of concrete on top of the 900 already laid. Will this method be structurally sound or is it essential that it is all poured in one go.any help on this would be greatly appreciated.

digerjones
Posts: 889
Joined: Fri Jan 18, 2008 9:32 pm
Location: cheshire

Post: # 60038Post digerjones

hi tom, i think its ok, think we did it on site a few years ago. i would'nt say it was good pratice. not sure what bc would say. on site the concrete was poured and the brickies had to sort it out, they would have to cut bricks, blocks. when you pour footing you normally pour to gauge ie, 2 blocks 3 bricks to get you up to damp.
dylan

local patios and driveway
Posts: 1568
Joined: Mon May 10, 2010 9:58 pm
Location: Gatwick
Contact:

Post: # 60040Post local patios and driveway

you need to speak to the building inspector at your local council.

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 60044Post lutonlagerlout

I cant understand why it was not levelled first time around
and if concrete is out of level normally us poor brickies have to set datums then cut blocks and bricks to suit
a strange set up
does he know what he is doing?
LLL ???
"what,you want paying today??"

YOUR TEXT GOES HERE

Pablo
Posts: 1990
Joined: Sun Mar 25, 2007 10:49 pm
Location: N/Ireland

Post: # 60046Post Pablo

your builder sounds like an idiot pouring the footing is not difficult and to have done it by eye shows a complete lack on attention that would have me feeling very nervous about the rest of his work. Any remedial work should be at his expense and not yours so time consuming or not its his fault and problem not yours.
Can't see it from my house

tommyanthony
Posts: 2
Joined: Sun Feb 27, 2011 9:12 pm
Location: newcastle

Post: # 60056Post tommyanthony

Thanks for the replies thus far, will contact building control today.....does anyone else have any opinion

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 60057Post Dave_L

One of the easiest things to get right.......the old alarm bells are ringing out loud.

Laser level is invaluable in this situation.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 60058Post seanandruby

i would expect him to scabble the surface and drill holes for rebar, preferably u bars to reinforce and join the top and bottom 'beams.' what a chancer he is.
sean

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 60071Post GB_Groundworks

As Sean said or you'll get a potential movement joint. We priced a job where the original grounworker had set the footings out wrong and bco wanted all the new footings along side the existing drilling and doweling with 20mm rebar at 400mm centres.

Surely they can just work the levels with the first few courses, normally our little treat to the brickies get them scratching their heads hehe but 200mm is a joke

Also you don't want the concrete to the surface most footings we do insists on 250 mm ground cover, did he not Mark his footing to level before pointing simple bit of ply and canof spray line gives you a neat line to work to.




Edited By GB_Groundworks on 1298916468
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 60072Post dig dug dan

crikey, on every garden wall i have done, i set pins into the ground at a level using the laser, spray can where they are, and level the concrete to the top of them. It leaves the brickies an easy job, and it takes no amount of time to get right.
Given that the foundations are the most important thing for a house, i would make sure they are done right first time.
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

Mikey_C
Posts: 952
Joined: Mon Oct 30, 2006 8:24 pm
Location: Bournemouth, Dorset

Post: # 60077Post Mikey_C

just out of interest did he offer/were there "any" mitigating circumstances!!!

haggistini
Posts: 1405
Joined: Thu Sep 27, 2007 10:29 am
Location: South Wales
Contact:

Post: # 60078Post haggistini

slap dash at best!!! first thing you see in the building game is a footing being level?
http://www.G-Tech.co
Bespoke Paving Contractor
M:07944036174

Less yap yap more tap tap!

joydivision
Posts: 186
Joined: Thu Jul 01, 2010 6:50 pm
Location: manchester

Post: # 62420Post joydivision

Yeah 200mm out is a joke.
Even if he didnt have a laser level etc, it should be alot more accurate than that by pegging it. Even using the old tamp and level method he should be within 50mm!

Like said above, check with BC. I would have thought he would need to rebar them together tbh.

Allan
A tidy job is a happy job.

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 62422Post Dave_L

Given the amount of time that has passed since the opening post, I would hope that the problem has been addressed by now.......it would be nice for a bit of feedback from the OP!

Or is he down in his footings breaking them out or drilling in rebar?? :p
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

simeonronacrete
Posts: 373
Joined: Tue Feb 18, 2003 3:11 pm
Location: Essex
Contact:

Post: # 63551Post simeonronacrete

Scabble the top surface of the original to remove laitence and any loose concrete. Brush clean. Damp with clean water. Make up a bonding primer of Ronafix liquid mixed with cement, 1:1, brush onto damp concrete, and pour new concrete onto wet / sticky primer. That'll give you monolithc adhesion.

Happy days.
Simeon Osen
Ronacrete Ltd - http://www.ronacrete.co.uk
Tel: +44 (0) 1279 638 700
Follow us at http://www.twitter.com/Ronacrete