Recent work
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 1328
- Joined: Thu Mar 26, 2009 9:00 am
- Location: Warwickshire
- Contact:
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
Was listening to the golf on 5 live, mega rain there and the American team waterproofs weren't waterproof haha. They had to go into the merchandising tent and buy waterproofs off a Cornish company. They interviewed the guy in one day he sold 600 waterproof suits at £209 each. £120k in a day haha.
http://www.guardian.co.uk/sport....erproof
Edited By GB_Groundworks on 1286027354
http://www.guardian.co.uk/sport....erproof
Edited By GB_Groundworks on 1286027354
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
few questions tony
who decided on the ground beam? did you have to get an engineer or copy similar spec from another job?
how deep was the bad ground, whats the cost comparison over going deeper and more concrete?
do you have to use the rsj or rebar cage?
ive done steels before to bridge protected tree roots etc but steel always on concrete pads not encased in concrete then the wall goes ontop of the steel.
who decided on the ground beam? did you have to get an engineer or copy similar spec from another job?
how deep was the bad ground, whats the cost comparison over going deeper and more concrete?
do you have to use the rsj or rebar cage?
ive done steels before to bridge protected tree roots etc but steel always on concrete pads not encased in concrete then the wall goes ontop of the steel.
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
when the digger driver noticed the ground change colour we investigated and found the main sewer run for the road behind where we are building running across the corner of our extension.albeit at 1500 deep
the peerless keith spears (structural engineer) came out and went away and did his calcs
and he came up with this ground beam
we concreted it yesterday with the c35 mix and the footings got built today
going deeper would still not have helped as the 6 inch pipe was haunched to 900 wide and it came across our foundations at an acute angle
probably all in all about £700 extra including steel concrete etc. havent put pen to paper yet
previously we have had to wrap the USB in some fine mesh but this one didnt call for it
cheers LLL
the peerless keith spears (structural engineer) came out and went away and did his calcs
and he came up with this ground beam
we concreted it yesterday with the c35 mix and the footings got built today
going deeper would still not have helped as the 6 inch pipe was haunched to 900 wide and it came across our foundations at an acute angle
probably all in all about £700 extra including steel concrete etc. havent put pen to paper yet
previously we have had to wrap the USB in some fine mesh but this one didnt call for it
cheers LLL
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
Right didn't see it was sewer thought was just bad ground, peerless hey I'll take that pepsi challenge with our guy. Jonathon kingfisher consulting is our engineer he's got more letters after his name than I've ever seen. He's also qualified architect haha, scary what those boys know he was trying to explain clay adhesion to steel piles to me complicated.
BSc(Eng) CEng FIEE MIMechE FConsE MAE haha
BSc(Eng) CEng FIEE MIMechE FConsE MAE haha
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
up early mikey
i only need 6 hrs sleep so as i fell asleep on the settee at 8PM i was up at 2AM
how i long for my teenage years when i could have a drink then go to bed at 2 AM and not wake up till 6 PM the following day
its a pain because you never feel fully refreshed but i cant sleep a minute longer than maybe 7 hrs at the most
cheers LLL
i only need 6 hrs sleep so as i fell asleep on the settee at 8PM i was up at 2AM
how i long for my teenage years when i could have a drink then go to bed at 2 AM and not wake up till 6 PM the following day
its a pain because you never feel fully refreshed but i cant sleep a minute longer than maybe 7 hrs at the most
cheers LLL
-
- Posts: 1270
- Joined: Mon Aug 10, 2009 8:30 am
- Location: york work anywhere where the stone takes me
- Contact:
same here four to five hours then done if i have to much pain killer ie beer sleep less on tour am last to bed and first up :plutonlagerlout wrote:up early mikey
i only need 6 hrs sleep so as i fell asleep on the settee at 8PM i was up at 2AM
how i long for my teenage years when i could have a drink then go to bed at 2 AM and not wake up till 6 PM the following day
its a pain because you never feel fully refreshed but i cant sleep a minute longer than maybe 7 hrs at the most
cheers LLL
Originalstonepaving.com
The very best in natural stone paving in new and reclaimed materials
M: 07968 582231
The very best in natural stone paving in new and reclaimed materials
M: 07968 582231
-
- Posts: 320
- Joined: Tue May 27, 2008 7:09 pm
- Location: uk
Right I'm gonna have a go at this thread!
Recent job, almost complete now. Nice stone to lay, jointed with gtfk basalt - not as good as rompox but all I could get. Just got the last few ground level ones to put in and connect the lights up. Straight after jointing:-
Plasterer coming back whenever to render top and sides of the low wall as no decision could be reached on copings.
In case anyone's wondering why we laid in the plane we did, the blockwork is nowhere near 90 degrees - it's quite a bit less due to a bizarre boundary line. Didn't want to see cuts at weird angles so this masks it quite nicely. Took a fair bit longer. No long lines and no four-corners meeting = a happy jonnyboy!!
Going to use a proper coating on the walls - Keim, which acts like an etch-primer and really bites into the render. Colour tba!
Will be sealing it with our special sealant !
Recent job, almost complete now. Nice stone to lay, jointed with gtfk basalt - not as good as rompox but all I could get. Just got the last few ground level ones to put in and connect the lights up. Straight after jointing:-
Plasterer coming back whenever to render top and sides of the low wall as no decision could be reached on copings.
In case anyone's wondering why we laid in the plane we did, the blockwork is nowhere near 90 degrees - it's quite a bit less due to a bizarre boundary line. Didn't want to see cuts at weird angles so this masks it quite nicely. Took a fair bit longer. No long lines and no four-corners meeting = a happy jonnyboy!!
Going to use a proper coating on the walls - Keim, which acts like an etch-primer and really bites into the render. Colour tba!
Will be sealing it with our special sealant !
full bed only - spot and dabs are the scourge!!
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 320
- Joined: Tue May 27, 2008 7:09 pm
- Location: uk
Thanks guys.
It's Strata Cathedral in the 6 sized 560 series, they do it in a 4 sized 600 series too. We kept all of the 420x560's out, using them along the front, re-used all the cuts, and all being well are 2 flags to the good :p
Neither wet nor sealed - just freshly polymeric'd - it'll tone down a bit in a few days. Will defo be sealing it though due to the sweet chestnut tree overhead! Bloody squirrels have been bombing the lads!
We're starting another one in this stuff next week, ironically next door to the first lady we ever laid it for.
I have a pic of that wee one somewhere - will post it if I can find it!!
It's Strata Cathedral in the 6 sized 560 series, they do it in a 4 sized 600 series too. We kept all of the 420x560's out, using them along the front, re-used all the cuts, and all being well are 2 flags to the good :p
Neither wet nor sealed - just freshly polymeric'd - it'll tone down a bit in a few days. Will defo be sealing it though due to the sweet chestnut tree overhead! Bloody squirrels have been bombing the lads!
We're starting another one in this stuff next week, ironically next door to the first lady we ever laid it for.
I have a pic of that wee one somewhere - will post it if I can find it!!
full bed only - spot and dabs are the scourge!!