Work or not - Fingers crossed
-
- Posts: 1270
- Joined: Mon Aug 10, 2009 8:30 am
- Location: york work anywhere where the stone takes me
- Contact:
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Posts: 1270
- Joined: Mon Aug 10, 2009 8:30 am
- Location: york work anywhere where the stone takes me
- Contact:
-
- Posts: 1136
- Joined: Sun May 08, 2005 9:25 am
- Location: North West
-
- Posts: 348
- Joined: Sun Feb 24, 2008 8:34 pm
- Location: Widnes
- Contact:
-
- Posts: 934
- Joined: Tue Nov 01, 2005 10:57 pm
- Location: Buckinghamshire
- Contact:
-
- Posts: 33
- Joined: Thu Oct 01, 2009 11:25 pm
- Location: Preston
- Contact:
Hope it comes off cookie. :;):
Hard work when you cant make contact with your clients to know weather to book other work in its place.
Not sure whats going to be happening in the north west as the forecast for the week is for temperatures not rising above -4 at best and feeling as cold as -12 ???
Hard work when you cant make contact with your clients to know weather to book other work in its place.
Not sure whats going to be happening in the north west as the forecast for the week is for temperatures not rising above -4 at best and feeling as cold as -12 ???
Always stuck in a hole - just the depth that varies
-
- Posts: 1136
- Joined: Sun May 08, 2005 9:25 am
- Location: North West
-
- Posts: 348
- Joined: Sun Feb 24, 2008 8:34 pm
- Location: Widnes
- Contact:
-
- Posts: 1270
- Joined: Mon Aug 10, 2009 8:30 am
- Location: york work anywhere where the stone takes me
- Contact:
well boyos 200 miles round trip no one there then spoke to one of the factory bosses my contact has been away back tuesday so should make contact then fingers crossed no good for laying but can stack out 200 ton off setts i hope cheers cookie keep smileing it can only get better cheers cookie ps my website is back on :p :;): :;):
Originalstonepaving.com
The very best in natural stone paving in new and reclaimed materials
M: 07968 582231
The very best in natural stone paving in new and reclaimed materials
M: 07968 582231
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
Stacking out 200ton of setts? Sweet Jesus..............
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Posts: 1270
- Joined: Mon Aug 10, 2009 8:30 am
- Location: york work anywhere where the stone takes me
- Contact:
nice warm work in this weather we once had for tarpoley cheshire 1000 ton to sort into sizes that was mind blowing we had them delvered all at once on open ground take a look at the finshed job makes the job in the old days they would have come to site allready sized.reclaimed all mixed up thats why they could get smaller joints :p :;): :;):Dave_L wrote:Stacking out 200ton of setts? Sweet Jesus..............
Originalstonepaving.com
The very best in natural stone paving in new and reclaimed materials
M: 07968 582231
The very best in natural stone paving in new and reclaimed materials
M: 07968 582231
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
Yeah I guess that ain't bad work in cold weather, keep moving and all that.
Worst job in the cold has to be a roofer, up and and not moving about very much.
Worst job in the cold has to be a roofer, up and and not moving about very much.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
When we re-paved one of the main streets in the centre of Liverpool with reclaimed setts, they were not only mixed sizes, they were still contaminated with the old pitch jointing, all of which had to be cleaned off prior to re-laying. We used somewhere around 4,500 tonnes over a 3 month period, with three laying gangs to be supplied each day. And this was through the summer, so the pitch was soft and pliable, making it much harder to break off from the sett edges.
In the end, we had a system whereby the setts were delivered to site and tipped under a flyover bridge out of direct sunlight, and then I had a couple of Tipperary lads who would come in at midnight and work through the cool of the night until 9 or 10 in the morning cleaning off the pitch and sorting the setts into gauged widths. They'd get through 30-40 tonnes per night between the two of them. Soul destroying work, but they were on a price per tonne and were making just as much as the tradesman sett layers, which isn't bad for what were essentially labourers.
In the end, we had a system whereby the setts were delivered to site and tipped under a flyover bridge out of direct sunlight, and then I had a couple of Tipperary lads who would come in at midnight and work through the cool of the night until 9 or 10 in the morning cleaning off the pitch and sorting the setts into gauged widths. They'd get through 30-40 tonnes per night between the two of them. Soul destroying work, but they were on a price per tonne and were making just as much as the tradesman sett layers, which isn't bad for what were essentially labourers.
Site Agent - Pavingexpert
-
- Posts: 1270
- Joined: Mon Aug 10, 2009 8:30 am
- Location: york work anywhere where the stone takes me
- Contact:
and i would have to say they would have worked harder pitch is a bitch not only goes every where sticks like shit to a blanket mind you would love to see 4500 ton infront of me now he he ps will wake up from this cobble layers dream or not :p :;): :;):
Originalstonepaving.com
The very best in natural stone paving in new and reclaimed materials
M: 07968 582231
The very best in natural stone paving in new and reclaimed materials
M: 07968 582231