Is it actually going to come into force as of October? I cant find anything new on it.
I have also been told by a contractor that it will only be houses which have NO existing driveways which will need planning or permeable paving and that existing drives can be extended and replaced.He works around derby and thats apparantly what his local council told him.
However i,m in essex and am not sure whats happening as the council know nothing.
cheers
I have also been told by a contractor that it will only be houses which have NO existing driveways which will need planning or permeable paving and that existing drives can be extended and replaced.He works around derby and thats apparantly what his local council told him.
However i,m in essex and am not sure whats happening as the council know nothing.
cheers
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
It's an absolute shambles at the moment!
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Posts: 166
- Joined: Sun Mar 16, 2008 6:01 pm
- Location: essex
I spoke to chelmsfod council today to be told
it will be coming in october,it will probably affect any drive to be paved
southend council told me
its coming in august and it may not be for all drives.
they basically know nothing and are not sure whats happening.
Great for people like us.and now i,m really panicking as i have work booked up for october.
it will be coming in october,it will probably affect any drive to be paved
southend council told me
its coming in august and it may not be for all drives.
they basically know nothing and are not sure whats happening.
Great for people like us.and now i,m really panicking as i have work booked up for october.
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
No-one, other than the twonks at Defra, know exactly what will be required. The proposal issued during the Spring is dire, but is the only clue we have to date as to what we can expect come October.
As reported in other threads and in my blog, the original proposal document, plus my submission can be downloaded from this site, but until Defra publishes its response, none of us know for certain just what will be required.
As reported in other threads and in my blog, the original proposal document, plus my submission can be downloaded from this site, but until Defra publishes its response, none of us know for certain just what will be required.
Site Agent - Pavingexpert
-
- Posts: 348
- Joined: Sun Feb 24, 2008 8:34 pm
- Location: Widnes
- Contact:
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
They can't police it; Defra will be relying on local Building Control, who are already over-stretched and under-funded. As I've said previously, this will become a rogue's charter unless it is properly controlled. It can't be properly controlled, so making it mandatory is a nonsense.
Site Agent - Pavingexpert
-
- Posts: 166
- Joined: Sun Mar 16, 2008 6:01 pm
- Location: essex
I think they will police it with fear,i.e the homeowners will not do it for fear of the council coming along and ripping it up.
I just can't see the likes of marshalls and Bretts taking it rolling over surely it has the potential to really upset their buisness?
I,m just not sure if its going to actually be brought in,its meant to be in October but the councils know nothing except it's meant to be happening.
What do you think Tony?
cheers
Jasper
I just can't see the likes of marshalls and Bretts taking it rolling over surely it has the potential to really upset their buisness?
I,m just not sure if its going to actually be brought in,its meant to be in October but the councils know nothing except it's meant to be happening.
What do you think Tony?
cheers
Jasper
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
Many of the better manufacturers are providing some form of training to interested contractors, which is all well and good, but does not address the problems of ...
1) is concrete block permeable paving really the best option for any given project?
2) is the generic specification promoted by each of the manufacturers actually suitable for every given project?
As block manufacturers, they are obviously keen to see CBPP installed as widely as possible, and certainly in preference to PIC, bitmac, resin, etc., but the key issue of the proposed action should be sustainability of the drainage, and not whether the surfacing is permeable or not. CBPP is being promoted as the answer, but it is the answer to a different question. As long as surface water is disposed of in accordance with the principles of SUDS, it really doesn't/shouldn't matter what surface/paving has been installed. Along with training lads how to lay CBPP, we should be training them to install soakaways, swales and rain gardens, but the training group is too busy pondering its own navel and the opportunity is being lost.
Secondly: the use of generic designs. These are used because the manufacturers need to offer contractors a simple 'design' that they can use on the majority of residential projects. Although we might not want to admit it, the paving trade isn't overpopulated with mathematicians, engineers or structural designers, and it's unrealistic to expect all contractors to be able to do the sums regarding soil permeability, run-off, storage capacity, etc. Hence the generic design: a spec that works for most drives, on most houses, in most parts of the country, most of the time, mostly.
To achieve this, the design has to be over-engineered, as too much capacity isn't a problem, whereas too little would lead to surcharging and/or flooding. Consequently, most of the 'off-the-shelf' specs being offered by manufacturers tend to be OTT. This results in additional (possibly unnecessary) excavation, plus the associated cart away, plus the extra clean aggs to build-up levels, all of which bumps up the cost, but we can't be sure it is actually warranted on any particular job because we are not training enough contractors to do the (very basic) sums that are needed to create site-specific designs. Again, this should have been addressed by the training group months ago, but wasn't, and probably won't be until after the proposed nonsense is enacted. I think that's what they call shutting the stable door after the horse has bolted.
So, the manufacturers don't see the imposition of this proposal as a threat to their business, but as an opportunity to replace some of their low-cost/low-profit standard paving with higher-cost/higher profit permeable paving blocks. That's why you don't hear *any* of them speaking up for SUDS paving rather than permeable paving.
1) is concrete block permeable paving really the best option for any given project?
2) is the generic specification promoted by each of the manufacturers actually suitable for every given project?
As block manufacturers, they are obviously keen to see CBPP installed as widely as possible, and certainly in preference to PIC, bitmac, resin, etc., but the key issue of the proposed action should be sustainability of the drainage, and not whether the surfacing is permeable or not. CBPP is being promoted as the answer, but it is the answer to a different question. As long as surface water is disposed of in accordance with the principles of SUDS, it really doesn't/shouldn't matter what surface/paving has been installed. Along with training lads how to lay CBPP, we should be training them to install soakaways, swales and rain gardens, but the training group is too busy pondering its own navel and the opportunity is being lost.
Secondly: the use of generic designs. These are used because the manufacturers need to offer contractors a simple 'design' that they can use on the majority of residential projects. Although we might not want to admit it, the paving trade isn't overpopulated with mathematicians, engineers or structural designers, and it's unrealistic to expect all contractors to be able to do the sums regarding soil permeability, run-off, storage capacity, etc. Hence the generic design: a spec that works for most drives, on most houses, in most parts of the country, most of the time, mostly.
To achieve this, the design has to be over-engineered, as too much capacity isn't a problem, whereas too little would lead to surcharging and/or flooding. Consequently, most of the 'off-the-shelf' specs being offered by manufacturers tend to be OTT. This results in additional (possibly unnecessary) excavation, plus the associated cart away, plus the extra clean aggs to build-up levels, all of which bumps up the cost, but we can't be sure it is actually warranted on any particular job because we are not training enough contractors to do the (very basic) sums that are needed to create site-specific designs. Again, this should have been addressed by the training group months ago, but wasn't, and probably won't be until after the proposed nonsense is enacted. I think that's what they call shutting the stable door after the horse has bolted.
So, the manufacturers don't see the imposition of this proposal as a threat to their business, but as an opportunity to replace some of their low-cost/low-profit standard paving with higher-cost/higher profit permeable paving blocks. That's why you don't hear *any* of them speaking up for SUDS paving rather than permeable paving.
Site Agent - Pavingexpert
-
- Posts: 25
- Joined: Thu Jul 10, 2008 8:51 pm
- Location: Cornwall
-
- Posts: 166
- Joined: Sun Mar 16, 2008 6:01 pm
- Location: essex
I did a test the other day on how permeable the ground in my area is. Guess what? Its heavy clay and a week later its still sitting there.
This will either make no difference to me or destroy people in our area as pumped water tanks will cost a fortune.
I still don't know if its really going to happen as no body knows anything and its meant to be happening in a couple of months.
This will either make no difference to me or destroy people in our area as pumped water tanks will cost a fortune.
I still don't know if its really going to happen as no body knows anything and its meant to be happening in a couple of months.
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
I agree with Slabba that, if a big soakaway (or other SuDS installtion) is used, there's nothing gained by insisting on permeable paving, and I have said as much in my submission to DEFRA.
As for Williams' clay, again, this is a factor that seems to have been blithely overlooked, so far, by the proposal.
Still no word from the faceless ones driving this proposal: it's becoming less of a farce and more of a potential disaster with each passing day.
As for Williams' clay, again, this is a factor that seems to have been blithely overlooked, so far, by the proposal.
Still no word from the faceless ones driving this proposal: it's becoming less of a farce and more of a potential disaster with each passing day.
Site Agent - Pavingexpert
-
- Posts: 348
- Joined: Sun Feb 24, 2008 8:34 pm
- Location: Widnes
- Contact:
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
Given that this is a politically driven proposal, I'm sure summat will happen, as politicians have no qualms whatsoever about introducing bollocks legislation rather than being seen to back down and admit they've not properly thought it through (think of the beloved poll tax).