What i did on my holidays - By ian age 41 1/4

General banter, tradesmen, recommendations and warnings, surplus materials, humour and owt else!
Post Reply
Suggers
Posts: 934
Joined: Tue Nov 01, 2005 10:57 pm
Location: Buckinghamshire
Contact:

Post: # 22895Post Suggers

Last two photies shot from neighbours garden? - does he want one now? - great to have a record from the bullet to the plate...
gutters? :p
"Meet the new boss - same as the old boss - We all get fooled again"

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 22896Post Dave_L

Ah, did you forget to install any drainage?

Neat trenching work here Ian :)
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 22897Post seanandruby

All that's missing is the sky Aeriel and beer fridge a? :;):
sean

IanMelb
Site Admin
Posts: 417
Joined: Wed Apr 11, 2007 11:53 am
Location: East Riding

Post: # 22900Post IanMelb

HI guys, neighbours are an older couple who already have some garden buildings of their own, mind you he has been shedding vicariously through me, and he's been very helpful when I've done silly things like run out of nails half way through a section, plus he's offered lots of useful advice.

There's no gutters yet but they're in the pipeline (boom boom). I'll be mostly draining into a grey water storage (butts or tank) and any over flow I'll direct to the surroundig flower beds and hedgrow.

No sky dish 'yet' ... ;)

IanMelb
Site Admin
Posts: 417
Joined: Wed Apr 11, 2007 11:53 am
Location: East Riding

Post: # 23804Post IanMelb

Bit of a status update (coz I know that you're all bursting to know what's going on..)

Over the last few weekends I've been working on the insides.

The walls are now fully lined with 100mm rockwool (plus breathable membrane on the cold side and vapour barrier on the warm side).

Over the top of that I've fixed the remainder of the OSB (from the roof) and the leftover T&G (from the outside walls) - the OSB goes to the top of the walls and 4 'courses' of T&G run along under that.

I've given it all a couple of coats of some leftover white silk emulsion so it's a lot lighter in there.

Today I had to empty the whole place ready for the flooring. I've locally sourced and purchased some high density polystyrene and have layed the first 100mm.

Tomorrow (hopefully) the next 50mm goes down, mixed with the inverted 'eggboxes' of underfloor heating 'pipe guide' insulation - we had a quantity of pipe and insulation surplus from our recent extension, so this is going into the shed floor.

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 23807Post seanandruby

6 months to the day you first posted. well done. 2 weeks then you move in a? :)
sean

IanMelb
Site Admin
Posts: 417
Joined: Wed Apr 11, 2007 11:53 am
Location: East Riding

Post: # 23809Post IanMelb

seanandruby wrote:6 months to the day you first posted. well done.
Blimey, never noticed that.

(sigh) 41 3/4 :laugh:

If I can get the floor down then I can move in before I get the ceiling insulated and boarded, so it might be 2 weeks :)

IanMelb
Site Admin
Posts: 417
Joined: Wed Apr 11, 2007 11:53 am
Location: East Riding

Post: # 23980Post IanMelb

All the floor insulation is now down and the underfloor heating pipe has been placed.

Used a router to create the channel in the 'normal' polystyrene then dropped the 50m of UFH pipe into it, using the egg box sections to form the bends

Image

I've fitted the floating chipboard floor this afternoon, no photies yet because (a) it was dark, and (b) how exciting can a photo of a chipboard floor be?

IanMelb
Site Admin
Posts: 417
Joined: Wed Apr 11, 2007 11:53 am
Location: East Riding

Post: # 26766Post IanMelb

Well, it's been a while - I've been waiting four months for a sparky to come and hook me up!

Now that's mostly complete I can start getting on with the ceiling

Image

1 First stage of electrics plumbed in - 10mm T&E on a 16A MCB
2 Internal lighting - fully switched L&N spur
3 PIR light on its own MCB
4 Internal lighting
5 Ring Main - 4mm T&E on a 32A MCB
6 Ring Main - 4mm T&E on a 32A MCB
7 Starting to insulate the ceiling using left over polystyrene
8 Hardboard covering - would prefer to use plasterboard or cladding but they are at least twice the price of hardboard - maybe later...
9 Will have to 'frame' the velux
10 After using up all the 50/75mm polystyrene switched to leftover rockwool
11 Second stage complete - now only the horizontal middle section to go

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 26767Post Dave_L

Lovely job Ian, well done!

Know what it's like waiting on a spark, I've had the same problem here....
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 26785Post Tony McC

Only four months? Any sparks that can start a job at such short notice must be a bit flaky! :;):
Site Agent - Pavingexpert

IanMelb
Site Admin
Posts: 417
Joined: Wed Apr 11, 2007 11:53 am
Location: East Riding

Post: # 26871Post IanMelb

Tony McC wrote:Only four months? Any sparks that can start a job at such short notice must be a bit flaky! :;):
And he didn't even turn up then !

I won't tell you who eventually connected up all the elastic trickery, suffice to say it's the same bloke who did most of the rest of the work on the shed ...

IanMelb
Site Admin
Posts: 417
Joined: Wed Apr 11, 2007 11:53 am
Location: East Riding

Post: # 27084Post IanMelb

Ceiling finished, just needs painting:

Image

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 27097Post seanandruby

typical, my missus reckons the light bulb dont go :)
sean

IanMelb
Site Admin
Posts: 417
Joined: Wed Apr 11, 2007 11:53 am
Location: East Riding

Post: # 27105Post IanMelb

It don't! :)

That's just a reclaimed one until I can find somthing a bit more 'industrial' on freecycle or ebay.

Post Reply