What i did on my holidays - By ian age 41 1/4
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
-
- Posts: 308
- Joined: Sat May 27, 2006 9:19 pm
- Location: cheadle uk
-
- Posts: 934
- Joined: Tue Nov 01, 2005 10:57 pm
- Location: Buckinghamshire
- Contact:
-
- Site Admin
- Posts: 417
- Joined: Wed Apr 11, 2007 11:53 am
- Location: East Riding
do you fancy building me one ian
The amount of time it's taking, I'm not sure that there is a business model in there for me
you realise this is only the beginning - you will now want more, more, ever bigger, ever more de-luxe
Actually I think that this is my fightback for not being 'allowed' to do more work on the extension we had built last year - the SO has no faith in me ...
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
as promised my pykie shed built from bits and bobs salvaged for sweet FA
all i bought was 4 bags of dust and the tile battens,whole thing all my own work <gulp>
needs rendering etc ,the last piccy is the M/H going down to the 1938 air raid shelter,10' by 7' room with 6' ceiling,floor is 10 ' below the floor of the shed so my beer should ok down there if the luftwaffe start up again
LLL
all i bought was 4 bags of dust and the tile battens,whole thing all my own work <gulp>
needs rendering etc ,the last piccy is the M/H going down to the 1938 air raid shelter,10' by 7' room with 6' ceiling,floor is 10 ' below the floor of the shed so my beer should ok down there if the luftwaffe start up again
LLL
-
- Posts: 308
- Joined: Sat May 27, 2006 9:19 pm
- Location: cheadle uk
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 607
- Joined: Mon Jul 09, 2007 11:14 pm
- Location: gosport
-
- Site Admin
- Posts: 417
- Joined: Wed Apr 11, 2007 11:53 am
- Location: East Riding
A fairly sedate weekend, this one - did some stuff other than shedding. Still, managed to add some extra roof timbers and a reclaimed Velux:
Query: when attempting a job tht would be best with two people, does it take one person 2, 3 or 4 times as long (if not more)? All that fetching of stuff that could be passed, clamping up that could have been held, etc ...
Query: when attempting a job tht would be best with two people, does it take one person 2, 3 or 4 times as long (if not more)? All that fetching of stuff that could be passed, clamping up that could have been held, etc ...
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Site Admin
- Posts: 417
- Joined: Wed Apr 11, 2007 11:53 am
- Location: East Riding