Post: # 19055Post Dave_L

This is a picture of two of our lads about halfway through a marathon 19hr shift, surfacing a haul road at a local quarry. Had to be done out of working hours, we'd laid 450 tons at 4.30pm (started at 6.30am!) and really didn't relish the thought of coming back in on Sunday AM to complete the job! Everybody, including the mixer-man agreed (Couldn;t have wished for a closer tar plant, but it still broke down during the day!!) to stay on until the job was done - we got home at 01.15hrs the following day!

Just before we had fish and chips at 5pm.......

Image

Needless to say, the Sunday was spent recovering, bit it was worth it (£££)

Image working this control panel in the dark.......towards the end, it was all done by feel! In the end, we laid 800 tons that day.

Image




Edited By Dave_L on 1179953676
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 19068Post lutonlagerlout

In the end, we laid 800 tons that day.
and there was me thinking that the machine had laid it??
19 hours? what did they do for t'other 5 ? slackers dave
lol only jk m8
i have done double shifts before but it is counter productive and illegal
i worked on the harlequin centre in watford and we were getting £120 a shift for a 12 hour day (big money in 1989)
but the problem with those sort of hours is that you are mentally drained for 3-4 days after
N1 m8
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 19070Post Dave_L

You should have seen some of the tight turns we had to lay, as it was getting dark. Not easy.

Rolling them wasn't easy either - requiring some skill and balls! Seat belts on!

You're right, we were zombies for a good three days after.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 19073Post lutonlagerlout

my mrs runs a medical recruitment agency,and it is big trouble for them if any of their staff do a double shift
i think you can do 9 then a 4 hour break then another 9
but like you say mate i would rather do a 1 long saturday then have to go in sunday for a couple of hours
did the tarmac plant stay open late then?
cheers LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 19088Post Dave_L

Yes - as we were surfacing a haul road at the quarry, the tar plant was 300m away from the site - and it was in their interests to stay going.

It was their busiest tar producing day ever - 800tons!
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 19159Post seanandruby

I do a 13 hour shift 5 days a week. then go to my lodgings and cook tea then wash up. cant remember anything after 9.00 oclock weekdays.
sean

Stuarty
Posts: 637
Joined: Sat Mar 18, 2006 7:35 pm
Location: Edinburgh

Post: # 19161Post Stuarty

That certainly is a shift dave, i bet you never slept so well!

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 19164Post lutonlagerlout

I do a 13 hour shift 5 days a week

is that 13 hours work time sean or 13 hours total??
when i left school the day was 7.30 till 5. 30, with 2 15 minute tea breaks and 30 minutes for dinner
now we do 8 till 4 with 1 30 minute break,i find people are more productive working shorter more intense hours,also doing domestic work ppl dont want you around outside school hours
when i was a lad everybody was trying to hide after the 3.15 tea break,so it was a waste of time really
cheers LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 19165Post Dave_L

8 to 4 - Tony - you lucky sod! :(
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 19169Post lutonlagerlout

i would like to work longer dave,but when we are at people's houses they dont want you there before 8, as they are getting up and they want you gone when the kids get home.
sometimes we have to work a bit later,but there are HSE issues once the kids get home
i take it your normal day is about 10 hours on the black stuff???
when i worked for *big jerry* it was 7 till 6 and that meant at the tarmac yard at 7 :(
don't miss those days
regards tony LLL :)
"what,you want paying today??"

YOUR TEXT GOES HERE

hondacrm
Posts: 41
Joined: Sat Feb 17, 2007 5:24 pm
Location: East Midlands

Post: # 19170Post hondacrm

Back in the early 80's when job's were scarce, I got a job with the local council as a road sweeper. They had some spare cash so they decided to clean up the borough. Normal start time was 7.30 but if you got there at 6.30 you could try and get out on the "dust" as spare as most days guys were on holiday or off sick so they needed replacements. You had one half hour tea break with the aim of finishing at around 2.30pm. One driver and four crew. The driver only got out of the cab if we were in a cul-de-sac. Great fun though, the tips we earn't always paid for breakfast and everyone got an equal share.

Now I struggle with an 8.45 start. :)
hondacrm

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 19171Post Dave_L

A normal day for us at 7am at our yard - then travel to the job. Finish when the job is finished - it is 'normal' for us to run 10hr days - but they are often 12/13hrs.....

But, more often than not, we have to be on-site before the other trades get there - otherwise we'd never get ourselves in place - we don't travel light - 1 x artic low loader, two 12 tonners and one 7.5 tonner, loaded with kit etc...getting there early means we can get in place usually without a hitch.

We cover a fair area, we usually have our first load of blacktop by 8am......so the early bird catches the worm!

But - tarmac supply problems can severely mess up our day - if the tar is an hour/two/three late then that is just added to the end of our day - and that happened the Friday before last - not good.

That turned out to be a 12hr day - albeit 3 hrs was just sat about, waiting.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 19183Post Tony McC

We had a spell when we were laying concrete floors for a certain company, and to keep the project on schedule, we'd usually pour around 4pm and then end up using power floats from around 8pm until well into the early hours of the morning, and then back on site at 8am to set up the next bays and pour.

Power floating concrete under temporary lighting is less than ideal, but the hours were the killer, and despite the vibration and noise, I almost nodded off once or twice.
Site Agent - Pavingexpert

Stuarty
Posts: 637
Joined: Sat Mar 18, 2006 7:35 pm
Location: Edinburgh

Post: # 19200Post Stuarty

Im in the yard for 7.30 and then out to the job, leave site at 4.30 unless i need to work on. My paid time ends when i finish on site, so i could spend anything from 15 mins to an 2 hours heading back to the yard unpaid. And im not a passenger in the van, i drive.

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 19207Post seanandruby

13 hours work time. Sometimes it can be longer ( never shorter ) for instance i may have to wait for the concrete gang to finish a slab etc before i can have some to cover my pipes. like you tony i used to be there all night on the upside down helicopter. many a time I've done a ghoster. when your there 24 hours flat out its no joke a? i try to swerve the big pours now. as i am in digs its beneficial to me to be at work, rather than on my own watch tele or summink, or, pissing the hard earned up the wall :D
sean

Post Reply