Best connection method (foul)https://ibb.co/hzb12q
-
- Posts: 148
- Joined: Mon Feb 08, 2016 6:00 pm
- Location: leic
Whats best way to make this new foul connection to existing? I want to come in line with the trench as pictured. I can put a couple of slow bends before going into IC or a slow bend after coming in to discharge in direction of flow. Obviously a flush connection would involve either cutting a branch in or cutting new pipe quite low down on invert of existing. I thought because I'm coming in on the angle best to keep an inch or so up off existing invert?
Would be doing all pipework inside IC with clay and use a flex seal to plastic once through wall act as a rocker.
Existing joints could do with bit of gear in as you can see
Open to advice please
Cheers
Would be doing all pipework inside IC with clay and use a flex seal to plastic once through wall act as a rocker.
Existing joints could do with bit of gear in as you can see
Open to advice please
Cheers
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 148
- Joined: Mon Feb 08, 2016 6:00 pm
- Location: leic
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 148
- Joined: Mon Feb 08, 2016 6:00 pm
- Location: leic
Tell me about it RE the pictures. Hence the thread title I got in a bit of a mess! Only one this site seems to like is "tiny pic". Its ok no registration needed but only one pic at a time.
Been out there this morning think i've got a good plan now. Will give me flush invert and get rid of existing bad joint. Think I will now go with a channel 45 Branch cut into existing. I offered a pvc branch in as I had it to hand, seemed to look about right with the angles.
What do you think?
Been out there this morning think i've got a good plan now. Will give me flush invert and get rid of existing bad joint. Think I will now go with a channel 45 Branch cut into existing. I offered a pvc branch in as I had it to hand, seemed to look about right with the angles.
What do you think?
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
-
- Posts: 148
- Joined: Mon Feb 08, 2016 6:00 pm
- Location: leic
Hi Boss, just got it done today. Also re benched the one further downstream with grano to keep all you lot happy.
I used the way I planned in the end. Keep that new invert nice and low as its only 600mm from top of paving at minute and I've got to get it to the new build and under slab. Should have plenty on a 1:80
Also got rid of a nasty lip where the old bend finished
I used the way I planned in the end. Keep that new invert nice and low as its only 600mm from top of paving at minute and I've got to get it to the new build and under slab. Should have plenty on a 1:80
Also got rid of a nasty lip where the old bend finished
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact: