They did not ask for permission to do so, and we had asked them to ensure the path would be built within the building regs and ensure that the water that falls on their property is managed by their property to reduce the risk of damp in our house. However their slabs have been installed such that the rainwater will run towards the wall of our house, at a height of 65mm above our walls DPC. We are on good terms with our neighbours, so I am completely at a loss as to how we have ended up with this sub-optimal situation, and I would really like to come to some sort of better arrangement before we start to see issues in our home.
It mentions on the DPC page that: “The property owner must consent to the breach.� regarding breaches of Building Regs relating to the DPC, however I’m unable to find anything about that enforces this. http://www.pavingexpert.com/dpc01.htm
Is anyone able to suggest anything?
Whilst we would be happy to work to get something approaching any of the alternative solutions listed on the DPC page on this site (which is what we suggested - I actually sent the link to the builder!), the builder has gone ahead and installed the slabs as described.
Our concern is that the 20mm gap is not sufficient to allow the channel to be maintained and allow sufficient drainage. Also there is no drain channel and the water that lands on their side of the property would just be drained towards the base/foundations of our wall (i.e. it is not linked up to any drainage system), and we live in an area with a high water table. Also the water draining down our wall is also a cause for concern, especially above our DPC.
When we previously suggested a “Dry Area Arrangement� as described on the site, the builder replied that the builder inspector had stated that this causes a “fall hazard� and a CDM issue (I assume he means Construction Design and Management) - although I have no way of verifying this claim.
When I phoned my local planning office / building control, they told me that their building inspector will only be inspecting the new extensions compliance with the building regulations, and that breaches of regulations relating to our DPC would not be picked up or concerned. Something I am still struggling to understand why this is not considered.
If you have any advice or suggestions of actions that could help us out in this situation that would be greatly appreciated. I am very concerned and completely out of ideas. The builder seems to do what he wants, and whilst I have spoken to the neighbours about our concerns, they seem happy to let the builder go about his work.
Thanks
WB.
P.s. on a lighter note, I love the site, use it heavily and built a lovely patio last summer with the info on it, and I have just ordered Tony’s book

[edit] Got my calculations wrong their slabs are approx 65mm above our DPC[/edit]