Future client is thinking of having a pond coming off patio leading onto garden area (ground level ) with the floating stepping stones running through it. Anybody have any advice on best way to build it ? No fish just plants and whatever wildlife makes it their home.
Dempsey Landscaping Liverpool
Natural stone paving & driveway professionals
http://www.landscapingbydempsey.co.uk
Tel: 0151 724 5245
Natural stone paving & driveway professionals
http://www.landscapingbydempsey.co.uk
Tel: 0151 724 5245
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
Think it will be costly. You'll need to waterproof it. I would blind it first, trowel it off to a good finish, waterproof on top of the blinding, blind again on that to protect the membrane. Build the plinths off the blinding. Sounds a good project to do. Be nice have stage photo's. Must be plenty advice on pond sites. Good luck.
sean
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
Unless you're doing them every week, ponds are right bloody pain in the arse. They seem to have a perverse determination to fail for the smallest, most insignificant of reasons.
And for that reason, ponds was always something we subbed out to a pond specialist.
I was quite happy to do the excavation, and then put in copings, connecting paths or, as you mention, floating steps stones, but the pond itself, the lectrix, the pump, the filtration and the water feed, let some other poor bugger deal with that!
And for that reason, ponds was always something we subbed out to a pond specialist.
I was quite happy to do the excavation, and then put in copings, connecting paths or, as you mention, floating steps stones, but the pond itself, the lectrix, the pump, the filtration and the water feed, let some other poor bugger deal with that!
Site Agent - Pavingexpert
-
- Posts: 237
- Joined: Thu Dec 09, 2010 4:41 pm
- Location: Liverpool, Merseyside
- Contact:
Thanks Tony, and Sean
Dempsey Landscaping Liverpool
Natural stone paving & driveway professionals
http://www.landscapingbydempsey.co.uk
Tel: 0151 724 5245
Natural stone paving & driveway professionals
http://www.landscapingbydempsey.co.uk
Tel: 0151 724 5245
-
- Posts: 2504
- Joined: Thu Jul 10, 2003 10:20 pm
- Location: hemel hempstead,herts. 01442 212315
Glad its not just me then!Tony McC wrote:Unless you're doing them every week, ponds are right bloody pain in the arse. They seem to have a perverse determination to fail for the smallest, most insignificant of reasons.
And for that reason, ponds was always something we subbed out to a pond specialist.
I was quite happy to do the excavation, and then put in copings, connecting paths or, as you mention, floating steps stones, but the pond itself, the lectrix, the pump, the filtration and the water feed, let some other poor bugger deal with that!
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"
-
- Posts: 42
- Joined: Mon Nov 25, 2013 9:28 pm
- Location: London
I've a done few and had problems like others but also had successes so if you do decide to go for it you should:
Assuming you're building a formal pool/pond with straight edges.
- concrete slab
- block work for the wall
- Underlay or you can use multiple layers of Terram
- butyll or greenseal liner. You can get box liners made up to your dimensions so that you don't get nasty awkward folds at the corners.
- you can build your piers for the stepping stones off the liner. It's a good idea to put a few extra layers of scrap liner under the piers for more protection.
The pumps and filters aren't difficult. It's stopping the thing leaking which is the the most challenging but I've found liners the best method.
Good luck if you go for it.
Assuming you're building a formal pool/pond with straight edges.
- concrete slab
- block work for the wall
- Underlay or you can use multiple layers of Terram
- butyll or greenseal liner. You can get box liners made up to your dimensions so that you don't get nasty awkward folds at the corners.
- you can build your piers for the stepping stones off the liner. It's a good idea to put a few extra layers of scrap liner under the piers for more protection.
The pumps and filters aren't difficult. It's stopping the thing leaking which is the the most challenging but I've found liners the best method.
Good luck if you go for it.
John
-
- Posts: 237
- Joined: Thu Dec 09, 2010 4:41 pm
- Location: Liverpool, Merseyside
- Contact:
Cheers John, much appreciated.
Dempsey Landscaping Liverpool
Natural stone paving & driveway professionals
http://www.landscapingbydempsey.co.uk
Tel: 0151 724 5245
Natural stone paving & driveway professionals
http://www.landscapingbydempsey.co.uk
Tel: 0151 724 5245
-
- Posts: 712
- Joined: Sat Oct 19, 2013 7:56 am
- Location: South Wales
- Contact:
-
- Posts: 237
- Joined: Thu Dec 09, 2010 4:41 pm
- Location: Liverpool, Merseyside
- Contact:
Cheers mate I'll post up when it's done
Dempsey Landscaping Liverpool
Natural stone paving & driveway professionals
http://www.landscapingbydempsey.co.uk
Tel: 0151 724 5245
Natural stone paving & driveway professionals
http://www.landscapingbydempsey.co.uk
Tel: 0151 724 5245
-
- Posts: 1951
- Joined: Sat Dec 06, 2008 10:28 pm
- Location: Preston, Lancashire