Hi all lots of new builds going up in this area Berkshire/Surrey/ and to be honest the build quality is shocking how they ever get passed is a mystery ???.
My main problem as a landscaper is at the beginning of the development any topsoil is removed and sold, the build is done on the sub soil with heavy machinery tracking over it creating a capping layer once the houses are completed poor quality screened topsoil is then imported and spread to levels, leaving a very poorly draining garden (we are on mostly London clay) how are the developers allowed to carry out these practices think i know the answer £
Anyway rant over, but I do believe the people buying these new properties are being ripped off big time in many different ways
Peter
New build quality
-
- Posts: 117
- Joined: Thu Feb 05, 2009 4:49 pm
- Location: Berkshire
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
In the last 6 weeks i've been bin bagged from two companies for refusing to do shoddy workmanship.
1) i refused to lay a foul drain with a back fall because some other guy up the line didn't orientate an IC base on two separate occasions, he put the slipper/stepped part as the invert making the main run to low for the outfall.
2) yesterday i was going to dig down with a 360 machine to 1.5 m to repair a known collar displacement on a 225 pipe. was told to "leave it as it is only a storm pipe and the concrete was coming for a reinforced slab in 2 hours." I refused as it was quite a leak judging from the flow in the manhole, so was told to leave site. ???
1) i refused to lay a foul drain with a back fall because some other guy up the line didn't orientate an IC base on two separate occasions, he put the slipper/stepped part as the invert making the main run to low for the outfall.
2) yesterday i was going to dig down with a 360 machine to 1.5 m to repair a known collar displacement on a 225 pipe. was told to "leave it as it is only a storm pipe and the concrete was coming for a reinforced slab in 2 hours." I refused as it was quite a leak judging from the flow in the manhole, so was told to leave site. ???
sean
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire