Hi
I'm building a 2.5ft high dry stacked terracing wall in the garden using some old reclaimed paving slabs as outlined here:
terracing
I've laid a 4 inch concrete footing below ground level and wonder how long I should leave it to cure before starting to build up the courses of slabs ?
Also - I haven't bedded the first course of slabs into the footing as illustrated, but I have created a backsloping profile in it so that the stacked slabs should create the batter as I build up. Does that sound reasonable ?
Thanks
P.s. Many thanks for putting this site together - it's been a constant source of reference as I've been re-landscaping the garden !
How long to leave terrace footing before building - Curing time for 4 inch concrete footing
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne