Posted: Sun Jan 24, 2010 9:08 pm
Hi, got a job to look at approx 40m2 of walling, not sure if its
dry or mortared yet, its been a while since i have done one this size. most of it is 600mm high on a steep slope.
i'm after a rough idea on time, i reckon 3 weeks for a dry stone.including digging out? i do remember a bit of head scatching.
cheers for any help.
dry or mortared yet, its been a while since i have done one this size. most of it is 600mm high on a steep slope.
i'm after a rough idea on time, i reckon 3 weeks for a dry stone.including digging out? i do remember a bit of head scatching.
cheers for any help.