Posted: Thu Dec 16, 2010 2:01 pm
Don't take the micky out of me but i have finally decided on my drive. I am having Hebden 40 plastic rienforcement and filling with 20mm gravel not soil. Anyway iam really panicing about the bottom of the drive. i have now dug the old kerb out and gone down to 200mm the trouble is i just have a massive muddy puddle where the drive meets the path. There is no where for the water to go as the path is higher than the drive. Do i just put shuttering up and lots of concrete with a kerb on top ? or should i dig a soak away under the drive there is no other drain cause even the garden is higher that the drive. The soil is mainly clay but it does soak in eventually.
So where do i start? i could raise the drive to help with drainage but because iam using gravel the water will just puddle again under the gravel which could effect the base. The weather is not helping but what should i do.
The plastic rienforcement is supposed to be layed on 40mm grit sand. The drive 58m2 is now ready for the mot type 1 to be delivered and compacted but i need to sort out the kerb / edging at the bottom of the drive first. Please see photo before i dug it out, now its a small lake !!!!!!!
http://www.facebook.com/album.p....83f9875
Please any advice would be fantastic
So where do i start? i could raise the drive to help with drainage but because iam using gravel the water will just puddle again under the gravel which could effect the base. The weather is not helping but what should i do.
The plastic rienforcement is supposed to be layed on 40mm grit sand. The drive 58m2 is now ready for the mot type 1 to be delivered and compacted but i need to sort out the kerb / edging at the bottom of the drive first. Please see photo before i dug it out, now its a small lake !!!!!!!
http://www.facebook.com/album.p....83f9875
Please any advice would be fantastic