Posted: Thu Mar 10, 2005 5:54 pm
First time post, so excuse if this has been answered.
We have quite a long drive that is basically concrete, with old paving slabs concreted down the middle of it. It looks bad now, so have sought some costs from a local tarmac layer.
He said that we can top the drive with a tarmac topping about inch, inch and a half thick. He will coat the drive first with a primer, and then lay the tarmac. Would this be OK, or will it break up fairly quickly?
I have just been looking at the Ronacrete stuff, but there is no indication of cost / sq metre, so I can't compare at all.
Cheers
Andy
We have quite a long drive that is basically concrete, with old paving slabs concreted down the middle of it. It looks bad now, so have sought some costs from a local tarmac layer.
He said that we can top the drive with a tarmac topping about inch, inch and a half thick. He will coat the drive first with a primer, and then lay the tarmac. Would this be OK, or will it break up fairly quickly?
I have just been looking at the Ronacrete stuff, but there is no indication of cost / sq metre, so I can't compare at all.
Cheers
Andy