Sometimes i despair - Gormlessness plummets to record depth

General banter, tradesmen, recommendations and warnings, surplus materials, humour and owt else!
Post Reply
Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 6710Post Tony McC

I had to look at a paving job yesterday on behalf of couple in a nearby village that have been having problems with their contractor. I can now announce that this character has managed to win this year's "Most Gormless" trophy with still a little over a week to go before the end of the 2004 competition.

The few square metres of flagging was skewed out of alignment and included all sorts of cuts in a futile attempt to make modular metric flags fit some other module that seemed to exist only in his tiny mind. Of course, it wasn't his fault that the flagging was sub-standard - it was the flags that were "not straight", except that every flag we measured was bang on 600mm wide, so then it was the walls that were at fault: the house was in the wrong place. And then it was next door's - their patio was even worse, as if that, in some way, mitigated his own slipshod work.

Moving on to the block paving, this clown had managed to lay the paving as something like a 36º herringbone (yes, 36º!). The pattern veered off to the right, but, surprise, surprise, it wasn't his fault. He'd set out the paving from the gate posts, and so it was the house that was at the wrong angle (again), not his paving. When it was pointed out that he should have used a line taken from the house, he claimed that "everyone always lays from the gate posts".

Image

So, as the paving was skewed in alignment, the cuts at the edges, instead of being a uniform size as is the case when a 45º herringbone is laid correctly to a perpendicular edge, actually got smaller and smaller, to the point where the final cut of a series was a miniscule triangle measuring approximately 5mm x 5mm. Again, this was not his fault, as that was the way block paving is supposed to be laid to driveways. He claimed to know all about of in-board cutting (or 'turned round cuts' as he calls it) but he had never used it on driveways as there was no 'pounding' from traffic.

Image

Apparently, and I have to admit I never knew this, the rules and regulations governing construction work don't apply to private houses: not even the Building Regulations - none of it matters because it's "private". The standards used on building sites, office developments and that sort of thing, are different: there are no standards for paving at someone's house, and he has documents to prove it. He's going to send me copies, so, I'll be able to share them with all us other contractors that have been getting it wrong all these years.

And it wasn't a "pavement", it was a "driveway" - did I know effing nothing? According to him, a pavement is only something found at the edges of a road; patios, driveways and the like aren't pavements, they're some undefined entity with no name, but they're definitely not pavements. Any fule no dat! And he wasn't a paving contractor, he grandly proclaimed; Oh no - he was much grander, he was "A Subbie" and therefore the rules of paving did not apply to him. He'd done "all them poncey courses" I'd done, such as health and safety, but he couldn't remember the names of any of them or where he'd studied.

One section of the driveway was backfalling. We had the automatic level on it, but it was obvious he had no understanding of how such a level works or what it does, and so he decried it as 'fixed' and got his neanderthal son to kick the tripod as he walked past, dragging his knuckles on the floor. When the spirit level, his own spirit level, also showed the paving to be backfalling, it was because the blocks "hadn't been whacked" and that when they were "whacked" the correct falls would magically appear and all would be well.

By this point, there was steam emerging from his ears and I was "making him mad" as I obviously "knew nuffink". He kicked the spirit level 10 metres up the driveway when the bubble wouldn't do what he wanted it to do, and meanwhile in the background, the neanderthal son was grunting "not bin whacked" over and over again like some sort of mantra. He said he wanted to smack me, but I wasn't worth it (I'm not! Believe me!) and he stormed off to 'phone the main contractor and complain about me.

I've spent 20+ years dealing with difficult, aggressive and infallible contractors, but this eejit, and the lumbering hulk of a missing link that is his son, take some beating. He had absolutely no understanding of how modular flags, such as Heritage or Millstone, are supposed to fit together without needing to be cut, and no understanding of what a "gradient" might be. He could not adequately explain any of his setting-out, blamed the house, the flags, the fence, the drains - anything other than admit he'd virtually no idea what he was doing.

The couple concerned have endured 8 weeks (yes - 8 weeks for a 60m² driveway and 15m² of a patio) of sheer hell. They had to endure a two week gap between the previous drive being excavated, the drainage smashed and the boundary fence broken, before the contractor/subbie returning to continue the work. All their previous requests for work to be corrected have been rejected on the grounds that they don't know what they're talking about, and they've hardly slept for the past week as it became more and more obvious that the work just wasn't right, but they were terrified of confronting the contractor.

It saddens me that folk such as this are part of our industry, and are besmirching our trade by reacting so aggressively to any suggestion that their work is sub-standard or just plain wrong. Until we get a proper training regime, with proper accreditation, the unsuspecting general public has no alternative but to be browbeaten and fobbed off with shoddy work by a small but scary minority of our number.

Let's hope 2005 sees fewer of these eejits. The job's hard enough as it is without this kind of gormless sod making us all seem as useless as him.
Site Agent - Pavingexpert

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 6716Post dig dug dan

dare I say it tony, but I am getting the feeling of "pikey" about this job. Does the contractor have a bone-fide landline and home address? Bet he drives a transit too, and is called "millenium driveways" or "a1 paving"!
More to the point, where did the customer get his details from? was he recommended?
The problem is also that for a few quid, anyone can join up to advertising sites claiming to recommend quality and you certainly are not vetted at all, as long as you pay your money. so unsuspecting housholders think they are getting a good job.
We need to educate the public as much as possible, and warn them that "door knockers" and people with their wife and kids in the van are no flippin good.
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

essexpaver
Posts: 12
Joined: Mon Nov 01, 2004 11:58 pm
Location: essex

Post: # 6798Post essexpaver

oi dig dug dan i go door knocking for my jobs while the wife and the kids wait in the van :p joking i see these kind of people all the time there everywhere i think the reason there still getting jobs is not the good quality of workmanship but the price with most people these days that i come across always compare my quotes to these cowboys i always say to them well get it done by them but dont come ringing me when u want it lifting there undercutting my quotes by 700-800 on a standard job how can i compete with that i pay for my muck to be taken away they let the farmer where there squating pay for it when they move on to another field:blush:
darryl

lee
Posts: 35
Joined: Sun Sep 21, 2003 9:31 am
Location: Bath United kingdom
Contact:

Post: # 6823Post lee

Tony, I have tried for the last 3 hours to get a block paviour to be cut into a triangular shape that small.... no avail...this man must be skilled!!!
I guess Ill stick to the more traditional route!
One other thing i noticed, is that the drive goes to a garage?? why on earth has he used gert big flags on there side for edging?? there is like a 6" gap between those and the fence!

I have also spent some time using photoshop on my pc to straighten the paving besides the house..... yep...no avail..


Thoughts to the poor people who have had the unfortunate experience of having this contractor around!

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 6826Post Tony McC

The flags-on-edge had to be used as a retainer given that the base of the fence panels is around 250mm higher than the paving. It was my suggestion to use a flag-on-edge as the cheapest 'fix' to the problem, but I had asked for either 'textured' flags or stone flags to match those used on the patio. Sadly, the so-called contractor decided to use plain pressed flags in an act of defiance.
Site Agent - Pavingexpert

lee
Posts: 35
Joined: Sun Sep 21, 2003 9:31 am
Location: Bath United kingdom
Contact:

Post: # 6827Post lee

owch, after a close look i can see the fence tread board!
shame to loose the width of the drive.

Well... I am glad there is/was a reason...

:)

Post Reply