Posted: Tue Sep 07, 2010 11:21 pm
I capped over a shallow concrete encased clay foul pipe with more concrete so no excavations were done for that section. This resulted in a bulk bag surplus of type 1. Any takers?
Next time I'll do a more thorough site inspection.
Al
Next time I'll do a more thorough site inspection.
Al