Posted: Tue Aug 11, 2020 6:35 pm
I've got about 1 1/2 cubic metres to do tomorrow I hope, starting early. It's going to be 30C by lunchtime. The site's in full sun.
I have a tarpaulin over it at the moment as a sunshade. I hope it all cools overnight. I have watered the all-in-one ballast. I won't use the two top layers of cement on the pallet 'cos they are hot. I'll be working on my own with a smallish mixer 100lt I think. The plan is to do a strip about 2m x 5m by about 140mm deep
I am worried that even if I keep a "wet edge" and work from one end to the other, it will go off too much before I can tamp it.
After/during, I will give it a bit of a wet/keep it covered with tarpaulin.
Is this too looney? I'd leave it for a day, but then we have downpours forecast....
I have a tarpaulin over it at the moment as a sunshade. I hope it all cools overnight. I have watered the all-in-one ballast. I won't use the two top layers of cement on the pallet 'cos they are hot. I'll be working on my own with a smallish mixer 100lt I think. The plan is to do a strip about 2m x 5m by about 140mm deep
I am worried that even if I keep a "wet edge" and work from one end to the other, it will go off too much before I can tamp it.
After/during, I will give it a bit of a wet/keep it covered with tarpaulin.
Is this too looney? I'd leave it for a day, but then we have downpours forecast....