Posted: Sun Jun 07, 2020 5:33 pm
hi one and all,
to start with a big thanks to the site for the info on it that i have used in the past , so the garden has been has been dug out and the type 1 has been whackered to 4 inches thickness. on this i am about to construct a raised bed made from incised treated softwood that comes in 200mm x 100mm x 2.4m . i have the timberlock screws , angle brackets for the corners and plain fixing straps for inner faces.i wish to set the first "course" level by bedding it down on a concrete mix. i will be using a small electric mixer, it will be seven rows in height so bringing it to correct height for SWMBO , the wood will be sat down on the 200mm face, what would be a good "mix" for this bedding layer so giving me the opportunity to set it level, many thanks in advance for your time spent on answering this for me.
to start with a big thanks to the site for the info on it that i have used in the past , so the garden has been has been dug out and the type 1 has been whackered to 4 inches thickness. on this i am about to construct a raised bed made from incised treated softwood that comes in 200mm x 100mm x 2.4m . i have the timberlock screws , angle brackets for the corners and plain fixing straps for inner faces.i wish to set the first "course" level by bedding it down on a concrete mix. i will be using a small electric mixer, it will be seven rows in height so bringing it to correct height for SWMBO , the wood will be sat down on the 200mm face, what would be a good "mix" for this bedding layer so giving me the opportunity to set it level, many thanks in advance for your time spent on answering this for me.