Posted: Sun Feb 26, 2017 9:56 am
Hi
I have a client who constantly moves Goalposts, and has decided She wants Porcelain Tiles laid on a project, where before we were scheduled for Stone. The areas total to 76m2, this includes steps etc. Originally we were only supposed to lay 36m2 around Her new Garden room(posh conservatory) and we had specified 20mm Porcelain , from London Stone. The client has taken it upon herself to go for a 10mm Fired Earth R11 product, which will also be used internally, using R10 tiles. Now I understand she wants the seamless internal/external floor, but this now means we are going to have to lay several large concrete slabs to accommodate the thinner Tiles!!! I have 3 areas, 1: 25.2 m2 2: 28m2 C: 8.51 m2. plus steps and a small landing. I'm going to lay the slabs 100mm thick, so how long before I can lay the tiles?
Edited By mickavalon on 1488103030
I have a client who constantly moves Goalposts, and has decided She wants Porcelain Tiles laid on a project, where before we were scheduled for Stone. The areas total to 76m2, this includes steps etc. Originally we were only supposed to lay 36m2 around Her new Garden room(posh conservatory) and we had specified 20mm Porcelain , from London Stone. The client has taken it upon herself to go for a 10mm Fired Earth R11 product, which will also be used internally, using R10 tiles. Now I understand she wants the seamless internal/external floor, but this now means we are going to have to lay several large concrete slabs to accommodate the thinner Tiles!!! I have 3 areas, 1: 25.2 m2 2: 28m2 C: 8.51 m2. plus steps and a small landing. I'm going to lay the slabs 100mm thick, so how long before I can lay the tiles?
Edited By mickavalon on 1488103030