OK so, obv the step were gonna breach 150mm distance but that pretty damn near breached the the actual DPC itself.
I flashed the wall above the DPC at the doorway itself going up the the threshold of the opening but I'm concerned about the parts of the steps to the right and left of the doorway of course with them being the parts that can transport the damp upwards through bricks above. Also the air bricks are bang next to the step.
Should I cut the steps down on the right and left or do you reckon I'll ge away with it?
Ta
https://www.dropbox.com/sh....aa?dl=0
I flashed the wall above the DPC at the doorway itself going up the the threshold of the opening but I'm concerned about the parts of the steps to the right and left of the doorway of course with them being the parts that can transport the damp upwards through bricks above. Also the air bricks are bang next to the step.