Posted: Fri Apr 17, 2015 5:08 pm
Hi after some reassurance please.
We are having an single storey extension done, its out of the ground now and so far a single out skin wall is about 5ft from the DPC level.
I gently moved the wall to see if it would wobble a little. And it does.
Is this normal until it is tied to inner block work or should it be sturdy. Its a section of wall that stops where the door will be so does appear to be floating at the moment.
Would I have done any harm gently checking the wall for movement? It was built in the last few days.
We are having an single storey extension done, its out of the ground now and so far a single out skin wall is about 5ft from the DPC level.
I gently moved the wall to see if it would wobble a little. And it does.
Is this normal until it is tied to inner block work or should it be sturdy. Its a section of wall that stops where the door will be so does appear to be floating at the moment.
Would I have done any harm gently checking the wall for movement? It was built in the last few days.