how long do you think a wall like this would take to build?

Its 600mm high and 12m long, double skin.

What depth would the footings have to be?

Job will be done by a brickie if i can find one.

My Webpage

My Webpage

Posted: Tue Dec 20, 2011 1:51 am
by haggistini
About the same time as that wedding cake :)

Posted: Tue Dec 20, 2011 4:43 pm
by dig dug dan
About the same time as that wedding cake


is that your missus in that pic bodge? cor!

Posted: Tue Dec 20, 2011 4:59 pm
by lutonlagerlout
brickie and labourer 900 bricks ,i would allow 4 days to be safe
you might do it in 3 in the summer
LLL

Posted: Tue Dec 20, 2011 5:21 pm
by bodgeitandscarper
Thanks lll much appreciated. What size footing would you have?

Posted: Tue Dec 20, 2011 6:21 pm
by lutonlagerlout
300 deep 350 wide with 225 of concrete in them
you would be surprised how slow laying bricks freehand can be
lay 4 level then plumb
lay 3.5 level then plumb
lay 3 level then plumb
ad infinitum
cheers LLL