Ive got a job lined up to demolish a 3m x 2m x 2.5m high bomb shelter, the walls and roof are approx 300mm thick, with rebar through it.

The customer would like to know how long it would take to bring it down, the best machine I can get into the job is a 3 tonner with a pecker. Only ever brought down one of these before, and I had to give that job to a mate of mine, who ended up seriously wounding his 3cx on it (although the fact he spent 3 days smacking it with the side of a ditching bucket definitaley didnt help!)

So lads (ie Giles :p) how long do you reckon to get the fecker down? Im guessing at 2 days?

Cheers :)

Posted: Fri Aug 26, 2011 11:21 pm
by Carberry
Put a picture of Gaddafi and Kim Jong Ill on the side of it, phone the FBI. It will be demolished within the hour, though they might destroy your local hospital too :p

Posted: Sat Aug 27, 2011 6:16 am
by lutonlagerlout
I have done 2 bomb shelters similar to what you described stuarty ,but with 2 men and kangoes
it took 2 of us a week and 5 skips
walls were 330 mm thick and roof was 300 mm reinforced concrete
I would say a day minimum and probably 2 with the machine
3 tonner is pretty powerful with a pecker
LLL

Posted: Sat Aug 27, 2011 6:30 am
by haggistini
Some demo pics would be nice

:cool:

Posted: Sat Aug 27, 2011 8:33 am
by Dave_L
Yep a decent 3 tonner and a quality peck with a decent operator would have it down in a day. Ear protection!

Posted: Sat Aug 27, 2011 3:40 pm
by Stuarty
Magic, thank you lads :) Ear protection will be firmly stuck on, im deaf enough without worsening things! Ill be sure to take a few pics for you haggi. Im planning on putting 2 of us on the job, I will be running the rubble out, and I'll get my mate on the digger, hes getting on a bit so I like to give him the easy tasks :p

Posted: Sat Aug 27, 2011 5:28 pm
by dig dug dan
can i suggest a product called silentmite?

You drill a series of holes, pour the stuff in and twenty four hours later, the concrete its shattered. Might save some time??

Posted: Sat Aug 27, 2011 7:29 pm
by Stuarty
Sounds good, but in my eyes would only be good for the floor slab, i wouldnt fancy having a structure cracking away all by istelf if you know what i mean

Posted: Sat Aug 27, 2011 9:44 pm
by GB_Groundworks
bollocks to that expanding stuff takes to long to drill all the holes at 4" centres, a decent 3 ton with a properly gassed hammer and a lad who knows what hes doing he down in a day. you on stihl saw cutting rebar etc, allow 2 for safety and maybe a third for clear up and unknown circumstances might be even thicker in the ground....etc

2 things ... no dry blows with the hammer ruins the seals

no levering with the hammer seen 8" chisels snapped off on 20 ton hammers through ppl using them like they would a kango

only use it to smash with, yeah you can pull a broken off bit with the point but dont use it as a pry bar as they are expensive

Posted: Sat Aug 27, 2011 9:55 pm
by rab1
my mate owns a demo company, 46 ton machine. dont know the cost but done in an hour.

Posted: Sun Aug 28, 2011 10:21 am
by Dave_L
...............But the costs of getting said 46t machine to site would be more than the job is worth!!!

Posted: Sun Aug 28, 2011 10:34 am
by Pablo
I think he was being sarcastic Dave is the scots humour to much for you at this time of the morning. :D

Posted: Sun Aug 28, 2011 6:42 pm
by rab1
I was being a smart ass, asked my mate about transport costs and apparently you need 2no waggons as 1 low loader cannot carry the machine and all off its attachments due to the weight and its really not cheap to move around.

Posted: Sun Aug 28, 2011 6:47 pm
by Stuarty
Thats not Central Demolitions big machine by any chance is it?

Posted: Sun Aug 28, 2011 9:19 pm
by rab1
could be lol