Stepped blockwork :(

Other groundworks tasks, such as roads and footpaths, terracing, fencing, foundations, walls and brickwork, tools and plant.
Post Reply
jonnyboyentire
Posts: 320
Joined: Tue May 27, 2008 7:09 pm
Location: uk

Post: # 65223Post jonnyboyentire

Hi all

Question if you please.
Is stepped blockwork on a top-half tile hung house common? We are tying into existing (not a builder) and the blockwork is stepped to accomodate the hung tiles. It causes us a problem because its b*ggered up where our g/f blockwork is (laid out by the sacked builder).
Pic enclosed - comments appreciated. Ta.
Image
full bed only - spot and dabs are the scourge!!

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 65253Post lutonlagerlout

yes, it is common on older properties
the downstairs might be 250mm cavity ,then upstairs is 215 brick or blockwork ,then buy the time you tilehang it you add 75mm so it becomes 290 mm and overhangs the downstairs
we did one last year though and all the new block work was the same from top to bottom
you just have 75mm tilt fillet at the bottom to accomadate the first row of eaves tiles
hope this helps
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

jonnyboyentire
Posts: 320
Joined: Tue May 27, 2008 7:09 pm
Location: uk

Post: # 65300Post jonnyboyentire

Spot-on Tony, cheers. presumably the fillet is timber?
full bed only - spot and dabs are the scourge!!

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 65312Post lutonlagerlout

we used the tanalised stuff that you use on feather edge fencing
the arris rail
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

jonnyboyentire
Posts: 320
Joined: Tue May 27, 2008 7:09 pm
Location: uk

Post: # 65398Post jonnyboyentire

Excellent, thats what i thought, I've got loads of that down at the yard :)
full bed only - spot and dabs are the scourge!!

jonnyboyentire
Posts: 320
Joined: Tue May 27, 2008 7:09 pm
Location: uk

Post: # 65610Post jonnyboyentire

Typical, it never rains but it pours. The stepped blockwork is all flat-laid blocks ie no cavity. Can't believe I never spotted it straight away. Bet if it had been at a client's house I would have sussed it from the other end of the garden!!! It was above a kitchen and only supported the sloping ff to gf roof over. We are building it up "square" to stick a hip-gabled proper bedroom over instead of the crappy dormer that was there prevously, but of course it needs a cavity so looks like it will be coming down (at least on one side - the other side will become internal. The irony is that the house is single skin anyway - it's an 8" belgian solid brick then dry lined with asbestolux-type board (now plasterboarded and skimmed to encapsulate). So we have no real cavity anyway...
Hey ho, we'll see what the building inspector has to say tomorrow......in retrospect it might be worth just taking both sides down, saves the bonding of flatties with normal blockwork at the front.....
full bed only - spot and dabs are the scourge!!

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 65624Post lutonlagerlout

dont be hasty johnny
speak to the BM first
he may have ideas that dont involve kno cking it down
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE