I see on the site that the cost of laying 100mm DtP1 crushed local stone is given as about £4 per sq metre once you get to over 100 sq metres. I am assuming this includes cost of stone, delivery, spreading, and rolling. But not initial site excavation and not VAT? Am I correct and is this cost and is the cost still about right - i.e. current with inflation - not sure when site was last updated.
I am assuming this is all I really need for car parking. Am I correct?
Cost of provide parking - With crushed local stone dtp1
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
Depends a lot on location we are in high peak got more quarries than brothels haha I can get freshly quarried type 1 for about £9 a ton delivered. But if you live in Norfolk it's going to cost you about £17 a ton.
As the gaffer is so busy I would reckon the prices are out of date and your best of working your price out.
As the gaffer is so busy I would reckon the prices are out of date and your best of working your price out.
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
As it raining and I can't be bothered getting wet walking back to my machine I'll work this out,
100m2 x 100mm = 10 x 2.2= 22 tons x £13 = £286
1 day for man and machine < 3 ton = £250
£536 / 100 = £5.36 then your vat and any extras like geotextile etc
For a car park id always go a bit deeper than 100 mm for safeties sake and I'd always use a geotextile for a car park
Edited By GB_Groundworks on 1281360179
100m2 x 100mm = 10 x 2.2= 22 tons x £13 = £286
1 day for man and machine < 3 ton = £250
£536 / 100 = £5.36 then your vat and any extras like geotextile etc
For a car park id always go a bit deeper than 100 mm for safeties sake and I'd always use a geotextile for a car park
Edited By GB_Groundworks on 1281360179
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 3
- Joined: Mon Aug 09, 2010 11:24 am
- Location: Wales
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
without seeing and feeling how the ground reacts i cant answer that, thats down to the skill of your groundworker/machine man etc, but your better on shale than peat haha.
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com