Posted: Thu Feb 11, 2010 11:01 am
Just wondering what other people would do.
I am in the middle of a job which entails building a retaining wall before I can lay all the block paving. At the moment the wall is two thirds built and half the block pave edgings are in place. Here is my worry having laid brick on tuesday turned up yesterday to see where the frost has just damaged the surface of the pointing, even though it was covered. So knowing it was going to be colder last night than the night before left site and laid nothing.
Gone in to day with a themometer and ithe shade where the wall is being built it was reading -1c at around 10.30am in sun it was around 3c. Decided to leave it again but it is now getting to the point where I have only been able to do 5 days work in the past 3 weeks due to the weather. Really getting me down.
I would like to know wether you all think I have made the right choice to not lay or should I have took the risk to lay and hope that the frost doesnt damage the fresh mortar??
I am in the middle of a job which entails building a retaining wall before I can lay all the block paving. At the moment the wall is two thirds built and half the block pave edgings are in place. Here is my worry having laid brick on tuesday turned up yesterday to see where the frost has just damaged the surface of the pointing, even though it was covered. So knowing it was going to be colder last night than the night before left site and laid nothing.
Gone in to day with a themometer and ithe shade where the wall is being built it was reading -1c at around 10.30am in sun it was around 3c. Decided to leave it again but it is now getting to the point where I have only been able to do 5 days work in the past 3 weeks due to the weather. Really getting me down.
I would like to know wether you all think I have made the right choice to not lay or should I have took the risk to lay and hope that the frost doesnt damage the fresh mortar??